Kit Malthouse
Main Page: Kit Malthouse (Conservative - North West Hampshire)(8 years ago)
Public Bill CommitteesWell, we will have to disagree. I think that if somebody is asking for planning permission—not just outline planning permission—for a major development in a conservation area that abuts a world heritage site, it is vital that the materials to be used are included as a pre-commencement condition.
Government Members will love the next part:
“No development shall take place until full details of the location of the proposed bat loft and a scheme for the provision of 10 house sparrow terraces have been submitted to and agreed in writing by the local planning authority.”
We all agreed earlier that protecting wildlife is really important. As the Minister knows, sparrows need to be protected if they are to survive and thrive. Such mitigation and compensation are necessary within the breeding bird assessment regulations.
I hope that the hon. Lady is not going to go through too extensive a list. One of the points that we have been trying to make is that quite a lot of the conditions that have been mentioned could be carried out during, say, the demolition phase; they do not have to take place or be agreed before the contractor starts at the site.
On the particular condition that the hon. Lady just raised, although it might be possible for the developer to agree a location for the bat and sparrow accommodation, there is no guarantee that the inmates will transfer willingly. Anybody who knows anything about bats—I happen to, strangely—will know that one can put up a bat loft to accommodate displaced bats but they might not use it for years, and they might never use it. They are capricious creatures that might decide to go elsewhere, perhaps because of the noise of the development.
The same is true of colonies of sparrows. Sparrows are strange birds, in that they do not travel very much. They tend to live in one place—as the hon. Lady said, they colonise particular areas—and they might even pick a particular tree that they never leave, but they are unlikely to move simply because someone decides to put up accommodation. All these things are iterative and could be done during the demolition phase. There is no reason to wait months and to have an argument about where the sparrow accommodation should go, because even the sparrows might not agree on where is decided.
The hon. Gentleman might have had a point had there been a demolition phase. As there is not, it is important that all these things are known up front. A further condition was noise mitigation. The developers were asked for details of proposed foul and surface water drainage; for an archaeological investigation; to refrain from site clearance, preparatory work or development; for a tree-protection strategy; and for a site map.
—and my hon. Friend the Member for North West Hampshire is going to help me.
I am grateful to the Minister for giving way, because I could not intervene on an intervention. Would the Minister care to ask the hon. Member for City of Durham how long the period was between the granting of the application of which she spoke, and a spade going into the ground, while materials, sparrows, bats and all those sorts of things were dealt with? How long did the process take?
The hon. Member for City of Durham may intervene, but I suspect that the answer is that it has not happened yet. I was going to come to that, but the hon. Lady gave a clear response to my point, so let me deal with her two points in turn.
The hon. Lady’s first argument is that there is a danger that the process will lead to more appeals, and will therefore slow things down, not speed them up. I do not agree, and I will make it clear why. If, at the moment, an applicant does not like the pre-commencement conditions imposed on them, they already have the right to appeal. It seems that there is no evidence that they are any more likely to appeal as a result of the fact that the local authority will now not be able to impose those conditions on them than they would have been otherwise.
The second argument, which is irrefutable, is that if an applicant is asked to do a large number of things before they can start any work on site, that is bound to delay the start of work on site. On most things, my hon. Friend the Member for North West Hampshire is beyond reproach, but on this issue, I blame him, because the hon. Member for City of Durham was in the midst of giving us a long and detailed list, and he rather hurried her up, so we did not get the full list. I managed to scribble down at least six of the conditions she mentioned. One condition was details of the materials to be used. That does not necessarily have to be a pre-commencement issue, but I accept that it is not that onerous. However, the designs of new homes for bats and birds will clearly take some time, as will the noise mitigation scheme, a drainage scheme, and tree protection schemes. Archaeological work is necessary and will always have to be pre-commencement, but it clearly takes time. All those things take time to design, work up, go to the local authority with, and get discharged.
It is difficult to comment with certainty, not knowing the site in question, and I would not want, without knowing the site, to express strong opinions, because the hon. Lady will have pictures of me printed and shown at local protests or something. None the less, some of those things, all of which it is important to deal with, can arguably be dealt with later in the process. It seems unarguable that the hon. Lady’s council requires of the developer a significant chunk of work that will take time and will delay the point at which the developer can get on site. The question of how many of those conditions are a necessary delay to the development is a legitimate source of public debate. The legislation tries to weed out those that are not necessary and focus on those that are.