Northern Rail Services: Greater Manchester

Jeff Smith Excerpts
Wednesday 6th June 2018

(6 years, 6 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Lord Johnson of Marylebone Portrait Joseph Johnson
- Hansard - - - Excerpts

I want to allow us a few days to refine the details of how the compensation scheme will work. We are working carefully with all players in the industry to ensure that a fair scheme is put forward that adequately provides redress to passengers. The Secretary of State has been clear that this will be funded by the industry. We will be bringing forward further details imminently, which I hope will answer the hon. Lady’s question.

What are we doing concretely to fix the problems that have occurred? Acting through the Rail North Partnership, the Department for Transport has put in place an action plan with Northern, which includes improving driver rostering to get more trains running now, increasing driver training on new routes, additional contingency drivers and management presence at key locations in Manchester, and putting extra peak services in the timetable along the Bolton corridor. Northern has also announced that, until the end of July, it will run fewer services than were originally planned, per the May timetable, to give passengers greater certainty and to increase opportunities for driver training. I believe that this temporary measure is necessary to stabilise the service, enabling improvements to be introduced gradually. Northern will then get back to a full timetable service.

The interim timetable, rolled out on Monday, will see an approximately 6% reduction in the number of train services—about 165 out of the normal 2,800 daily services. Northern is expecting to start to see significant improvements this week, from today, as their drivers are fully rostered on to the new interim timetable. The timings for today, as of 10.35 am or so, saw Northern achieve 86% on the public performance measure. With 665 or so trains operated, 2% were very late or cancelled, which is about 15 trains. There is positive progress here. This is Northern’s best weekday morning performance since the timetable changed. That 86% compares with weekday out-turns of between 60% and 70% for the first two weeks following the introduction of the May timetable.

Jeff Smith Portrait Jeff Smith (Manchester, Withington) (Lab)
- Hansard - -

I have not heard an explanation of why Northern could not suspend bringing in the new timetable. The Minister has just outlined that the new interim timetable has made a difference. Why could it not have thought about bringing in an interim timetable in the middle of May, instead of the new changed timetable?

Lord Johnson of Marylebone Portrait Joseph Johnson
- Hansard - - - Excerpts

The May timetable is a big timetable change. It is roughly four times larger than any previous change over recent years of such timetables. It was a six-monthly timetable change. It was a very big change that reflected the massive investment that has been going into the rail system and all the opportunities to create new services across the country. In those circumstances, the timetable change did not just affect Northern and Thameslink, it affected every train operation in the country. All those other train services around the country had interlinkages with the train services being run by Northern, Thameslink and other Govia Thameslink Railway services.

As a consequence, simply suspending the timetable was not possible, because all the other train operators had put in place their own driver rosters and driver training programmes for all the other services running across the rest of the country. Not introducing the May timetable at that point would have been a far worse and more disruptive solution. This is progress. We recognise that there is significantly more to be done. We want to get back to where we were meant to get to, which was the full introduction of the May timetable, as soon as we can, but we want to do that gradually and to reintroduce services as soon as we can, once the appropriate driver training has taken place.

How can we ensure this does not happen again? As I have mentioned, work has begun to set up the independent inquiry into the timetable, implementation and deliverability of future timetable changes. That will be chaired by an independent transport expert, the chair of the current independent regulator, the Office of Rail and Road, Professor Stephen Glaister. In parallel to the inquiry, the Department for Transport is assessing whether Northern met its contractual obligation—a subject which a number of hon. Members asked about—in the planning and delivery of this timetable change. We will carefully assess Northern rail’s planning, risk assessment and resilience in preparing for the May timetable change.

We are currently reviewing whether Northern is in contravention of the franchise agreement. If it is found to be so, it would be referred to the Department’s enforcement advisory panel. The purpose of that panel is to review any contraventions of the franchise agreement fairly and consistently across all franchises. It will seek to respond in a consistent manner where different train operators commit similar contraventions, taking account of the Department’s enforcement policy and previous enforcement decisions, and will recommend the appropriate response, including any remedial plan or enforcement action, if required.