All 1 Debates between Iain Stewart and Alec Shelbrooke

High Speed Rail (Preparation) Bill

Debate between Iain Stewart and Alec Shelbrooke
Wednesday 26th June 2013

(11 years, 5 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Iain Stewart Portrait Iain Stewart
- Hansard - -

I am grateful to my hon. Friend for that intervention. I took the opportunity to visit the route of High Speed 1 and saw the noise mitigation measures that had been put in place. The noise of the trains is not much more audible than that of an A road or other minor piece of infrastructure.

Alec Shelbrooke Portrait Alec Shelbrooke
- Hansard - - - Excerpts

I was on that trip with my hon. Friend and a notable fact given to us by Kent county council was that Maidstone is now lobbying to have the line go through the station, whereas it was vehemently opposed to that originally.

Iain Stewart Portrait Iain Stewart
- Hansard - -

My hon. Friend is absolutely right.

To those who voice concern about visual intrusion on areas of outstanding natural beauty, I simply make the point that railway infrastructure need not be ugly—it need not be concrete blocks. Look at some of the fantastic pieces of railway engineering and architecture we have: the Forth bridge, the Glenfinnan viaduct, Brunel’s bridges and tunnels—they have enhanced the landscape. I urge my right hon. Friend the Minister of State to make HS2 into an opportunity to showcase the best of British design and engineering, with bridges, viaducts and other infrastructure that show off and augment our landscape.

In the couple of minutes remaining, I will highlight five specific concerns and make some suggestions. The first is about the rolling stock for the line and making sure it is compatible with the classic network, particularly on the Anglo-Scottish services. At present, we have tilting trains that allow conventional lines to be used at high speed, but if high-speed trains cannot tilt, journey times on the classic network will be lengthened to an extent that might offset the time gains on the high-speed line. I urge the Minister to consider that.

The second concern, justifiably felt by people in Buckinghamshire, is that the line goes straight through the county with no stop. The high-speed line will intersect with the new east-west line in Buckinghamshire. I ask that, when the scheme is considered in full—the Y-network and connection to the channel tunnel—the case will be reassessed for an intermediate stop at Claydon junction. I would suggest calling it “Milton Keynes Parkway”, but others may have different ideas. That would enable people in the area to access the lines, which I believe would augment the business case.

Only seconds remain, so I will very quickly highlight the point, which has already been well made, about properly connecting airports, High Speed 1 and the channel tunnel. I do not think the plans are optimal. Finally, I urge my right hon. Friend to look at capacity at Euston, where the tube network is already pretty crowded. I believe we need to consider Crossrail 2, so I was delighted when the Chancellor floated that possibility in his statement earlier today. Notwithstanding those concerns, I support the Bill.