A14: Junction 10A Debate

Full Debate: Read Full Debate
Department: Department for Transport
Wednesday 21st February 2024

(9 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Guy Opperman Portrait The Parliamentary Under-Secretary of State for Transport (Guy Opperman)
- Hansard - -

What a pleasure and joy it is to serve under your chairmanship, Sir Gary. I put on record my thanks for your work in the House of Commons and our sadness that you are departing; those massive shoes will need to be filled.

It is an honour to respond to my hon. Friend the Member for Kettering (Mr Hollobone). Before I get into the nuts and bolts of junction 10A, I should say that, even though it does not exist as yet, it is probably the most debated junction in the House of Commons in the history of roads and transport. There was a debate on 4 November 2020 and then another debate exactly one year ago, on 21 February 2023. I thank my hon. Friend, because he is a fantastic campaigner. Every single Member of Parliament looks up to him because of the work that he does on behalf of his constituents, and he is nothing if not determined and persistent. He is a worthy local champion for the fine town of Kettering.

My hon. Friend is right: I was privileged and honoured to attend on 1 July 2022—I looked that up—during the dog days as the Minister responsible for pensions, the older persons’ fair at the Corn Market Hall in Kettering. That is a delightful building, and that was a fantastic opportunity to meet dozens and dozens of people who are doing amazing community group work and amazing volunteering but also providing older persons’ work and opportunities, part time and full time, in a variety of ways. It was credit to my hon. Friend and his local council, which was co-running that fair, that I was able to see the massive enthusiasm for community, above everything else, but also the jobs that everybody was trying to provide.

I then enjoyed a particularly fine lunch at 27 Crown Street, where I was talking about all those matters—older workers, pensions and the like—and was only slightly taken aback when someone said, “You really do look too fat to be a steeplechase jockey.” That is something that one has to bear when one is a long way off racing weight. Such is life.

Now I come to the nuts and bolts of the issue today. As my hon. Friend is utterly aware, the A14 is in effect a modern-day Watling Street. It is the key junction, key connection, between so much across the country. It is an integral part of the road network, and it is utterly key to his constituency of Kettering. I totally get that. That point is utterly well made.

The Hanwood Park development is also genuinely groundbreaking. I do not think there is any doubt whatever that the scale of ambition, the number of developers individually, as corporate entities, and the scale of the desire to build a proper garden city that has all the amenities, schools and free schools, and the business development that follows are genuinely game changing. It is something that has been going on for a long time, dating back, as we my hon. Friend and I are acutely aware, to the planning application successfully going through in 2010. It has then had various iterations as the houses have been built.

It is also very much the case that this project has the full support of the Department for Transport. I want to assure my hon. Friend of that, first in outline and then by getting into the nuts and bolts of the details. First, he rightly makes the point that he has met many roads Ministers. He also had a specific meeting with the present Secretary of State, who stated unequivocally that this is a unique development because it is something with a high degree of contribution by developers. On 22 March 2023, the Secretary of State stated:

“I am happy to continue progressing the scheme as previously planned during the RIS3 period, subject to business case.

I also agree with your suggestion that National Highways and DfT officials should cooperate intensively with the local planning authority and the developer to progress the scheme as quickly as possible.”

There have been a number of developments since then, and I want briefly to go back over the planning and the memorandums that have been engaged in before I get to the final points I wish to make. The first issue, clearly, is what has happened in the passage of time since the 2010 planning approval. In April 2021, the developer resubmitted a planning application for the full 5,500 homes, as my hon. Friend is acutely aware. The key issue will be the trigger point in respect of when certain conditions apply. I take it from his assurances in the House that we are to have the final resolution of that planning application in the next couple of months. There is a degree to which this is chicken and egg, and I fully understand that point, but I can certainly confirm that this project is and will be in RIS3.

There are two provisos to that. The first is the business case, but I think my hon. Friend and I know that this project probably has the best business case in the country, as far as I am aware, because it has significant developer contribution and is absolutely in support of all our other objectives. Personally, I see no difficulty whatsoever, but these things have to be assessed on an ongoing basis.

The second key point is that the project is subject to planning permission. If planning permission were to be refused, that would make things complicated. However, I want to convey to my hon. Friend and his constituents, particularly the Hanwood Park residents, and to this House and, most importantly, the local authority that will determine the planning condition that, provided the planning condition is satisfactorily passed, all the conditions in RIS3 will apply. It seems to me inevitable and entirely right that this project should be built as part of RIS3.

Clearly, I cannot pre-judge the decision of my hon. Friend’s local authority in the next couple of months, but there is no doubt in my mind that this project should proceed. Commitments have been made for this project in the past, and, subject to those two preconditions, both of which are eminently resolvable, it should unquestionably be achieved in the next few years.

I wish to try to make clear a couple of other minor points. As I understand it, in the summer of last year—in July 2023—following the steer from my right hon. Friend the Secretary of State for Transport, a memorandum of understanding between National Highways and the developer was signed that set out various protocols, including the role of National Highways in ensuring the works by the developer associated with junction 10 on the A14. Those technical works are already under way as part of stage 1, led by the developer and its technical team. There is also a full transport assessment of the updated proposals, and National Highways is supporting that work and undertaking necessary checks and assurances.

While it is true that this junction does not exist at the present stage, I have some very impressive plans of said junction, and it is way more advanced than many things that are ethereal in the mind and insubstantial in the action that we often discuss in this House. The utterly key thing is that the local authority needs to progress the planning application, and National Highways needs to put all hands to the pump to ensure that it is ready to proceed. I can give my hon. Friend the assurance, as previously expressed in writing by the Secretary of State, that this project is part of RIS3.

Philip Hollobone Portrait Mr Hollobone
- Hansard - - - Excerpts

Before the Minister sits down, I thank him for his detailed and assiduous response. Once the planning permission is granted—hopefully in the next couple of months—would the Minister be kind enough to come and visit the site so that he can see it for himself and we can then progress the expedition of this scheme on the ground?

Guy Opperman Portrait Guy Opperman
- Hansard - -

My hon. Friend has prejudged the point I was going to make, which is that it would unquestionably be a delight, an honour and a privilege to return to the good people of Kettering and to spend some time with him. That was my intention. I do not think there is much point in me coming until the local authority has made its decision, but when that happens it would seem entirely right and proper for me, my hon. Friend, the local authority and National Highways to meet on site. I could come and visit the site and give the proper direction, oomph, and various other steers that this project needs to be proceeding apace. I hope that reassures him. I look forward to coming to visit Kettering on another summer occasion, and to the local authority making the right decision so that we can then progress junction 10A. That is something the Government support in its entirety.

Question put and agreed to.