Sittingbourne and Sheppey Road Infrastructure Debate
Full Debate: Read Full DebateGordon Henderson
Main Page: Gordon Henderson (Conservative - Sittingbourne and Sheppey)Department Debates - View all Gordon Henderson's debates with the Department for Transport
(11 years, 1 month ago)
Westminster HallWestminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.
Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.
This information is provided by Parallel Parliament and does not comprise part of the offical record
It is a delight, Mr Sheridan, to serve under your chairmanship. Two years ago, I took part in a general Westminster Hall debate and used it not only to highlight some of the positive business developments that were taking place in my constituency, but to set out a number of problems with the local roads that needed to be solved if we were to attract even more investment to the area. Those problems have not gone away and in some cases have got worse. I want to use my time today to repeat some of my concerns about the road infrastructure in my constituency.
In many ways, the problem has been brought about by the success of business in our area, which is ironic because the other side of the same coin is that the very same problem could hold back future investment. Sheppey has a major port that is used for the import and export of thousands of cars every year, and we have the largest prison population in the whole country. Eurolink in north Sittingbourne will, when its current expansion plans are realised, be the largest industrial and business park in the south-east. Morrison’s regional distribution centre is also situated in Sittingbourne, and next door is the largest paper mill in the United Kingdom. The thriving Kent science park is in south Sittingbourne and is at the cutting edge of life sciences.
Those success stories generate valuable employment, but also an increasing amount of traffic that is threatening to overwhelm our local roads. When I listen to BBC Radio Kent in the mornings to hear what traffic problems I will face on my drive into London, the same motorways are almost always mentioned: the M25, the M20, and the M2, as well as the Dartford crossing. On the A roads, there is occasionally a problem on the A2, the A20 and the A21, but one Kent road is mentioned every morning without fail: the A249, which happens to be the main road into Sittingbourne and Sheppey from the M2.
Anyone who witnessed the horrendous multi-car pile-up on the Sheppey bridge a few weeks back will appreciate the number of vehicles that use the A249 every day. Not only is it the only road off the Isle of Sheppey, it is also the road used by the thousands of people who commute from Sittingbourne. Traffic from the Eurolink industrial park, the Morrison’s regional warehouse and the paper mill also feeds on to the A249. That has created at least two major pinch points: one at the roundabout at the junction between the A249 and the northern relief road—I will come to that project in a moment—and the other at the roundabout where the A249 meets junction 5 of the M2. The latter is a particular problem because the congestion created at the roundabout affects not only the slip roads from the M2, but local roads.
The Kent science park also creates congestion on local roads in south Sittingbourne, which is another problem that needs to be resolved. The owners of the park, with Swale borough council and Kent county council, have plans for a link from the M2 at what would become junction 5A, but they have been stymied by current Highways Agency restrictions on spur roads from motorways. I wrote to the Minister’s predecessor about the problem and received an assurance that his Department was reviewing that restriction. Is there any update on that? I am keen to see that spur built because not only would it help to relieve congestion on a number of roads in south Sittingbourne; it could form part of what we hope will eventually become the southern relief road.
That leads me back to the northern relief road, which links the A249 to both Eurolink and Great Easthall, which is a housing development north of the A2. The problem is that the northern relief road has never been completed, so it is not much of a relief to anyone. Obviously, local businesses on Eurolink and the residents of Great Easthall want the final link to be built as soon as possible, but many other people feel that finishing the northern relief road without first building a southern relief road would be a mistake because it would simply increase congestion on the A2 and the number of vehicles using rural roads in villages such as Bapchild, Bredgar, Rodmersham and Tunstall as rat runs to the M20.
I have some sympathy with the latter view, which is one reason why I have long held the view that a southern relief road is critical to Sittingbourne’s long-term future. Not only would it open the way to completion of the northern relief road, while protecting the southern villages; it would help to reduce congestion on both the A2 and the A249.
Another pinch point on the A249 is where it joins the A250 on the Isle of Sheppey. Until it hits that junction, the A249 is a dual carriageway, but thereafter it goes into a single lane all the way to Sheerness. That part of the A249 is also the main road into Sheerness docks and we desperately need the dual carriageway to be extended at least as far as the eastern boundary of the docks to allow easier access. That would allow a major expansion of the docks, thereby creating additional employment in one of the most socially deprived parts of my constituency.
There is also a problem on Sheppey with the newly created A2500, which is the main road link between the A249 and the eastern part of Sheppey. The A2500 feeds into Minster, which is the largest community on Sheppey and has seen the largest expansion of housing. Sadly, the junction at the A2500 and Barton Hill drive, which is the main route into Minster, is simply not fit for purpose and is seriously congested daily, all year round. The A2500 is also the main road to the three prisons on Sheppey, and ironically also feeds the main holiday camps on the island, so the congestion increases still further during the summer.
The Minister has kindly agreed to come to my constituency next year to open a new logistics hub that, ironically, is being built alongside the A249 and will no doubt add to the current traffic problems at the Morrison’s roundabout. I wonder whether he would agree to meet representatives from Swale borough council and my local business community on the same day to hear at first hand their concerns about our local road infrastructure.