High Speed Rail (London – West Midlands) Bill Debate
Full Debate: Read Full DebateGlenda Jackson
Main Page: Glenda Jackson (Labour - Hampstead and Kilburn)Department Debates - View all Glenda Jackson's debates with the Department for Transport
(10 years, 7 months ago)
Commons ChamberI do not think that I have been misleading. I have been very open about the west coast main line. I do not think it is crumbling—as I have said, there has been £10 billion upgrade on the line north of Rugby. Between 2014 and 2019, we shall be spending £38 billion on the existing railway network, on things such as the electrification of the midland main line and a number of other schemes that I have already mentioned.
Even on moderate forecasts, services will be increasingly full by the mid-2020s. If we do not create extra capacity, people at stations such as Milton Keynes and Northampton will have to queue to get on a train to get to work. That is despite the £9 billion that we have spent on the west coast main line in recent years. More upgrades like that will not provide the extra capacity that we need. A new north-south railway line is the right answer. From day one, it will improve journey times and train services to Manchester and to the north-west and Scotland, because HS2 trains will continue on the existing network. It will free up more space for commuters and freight on existing routes, and places up and down the country will benefit from more services and seats. Although it is too early to talk about precise timetables, Milton Keynes, an area of particularly close interest for my Parliamentary Private Secretary, could get 11 trains an hour to London compared with six now, and places such as Rugby would get more non-stop journeys to London.
Today's debate is about phase 1, but when it is complete HS2 will be a wider network. We have consulted on phase 2, and I know that many Members have a strong interest in ensuring that we get the plans right. That should include serving cities on the eastern leg through the east midlands, Sheffield and Leeds as well as the north-west, and we will set out more details later this year.
Of course we must design HS2 well and build it carefully, which means making sure that our young people have the skills to get the engineering jobs it will create. We have therefore announced plans for the first new further education college in 20 years, backed by HS2. Soon we shall announce the winning location for the central facility and a network of outposts. I know that many places are keen to take part, such as Aylesbury college, Manchester and Birmingham.
One of the things that matters most about HS2 is the huge opportunity it offers to the next generation. There will be 2,000 apprenticeships—not just one-off jobs building the line, but careers. The numbers involved mean that we will take the skills base in this country to a new level, so the country will not only be better connected but better trained with the skills we need to compete not only in transport but across a range of industries. This is not just investment in steel and rolling stock; it is a huge investment in our people across the nation.
The Secretary of State mentions apprenticeships and training. With HS1, the building of Stratford and, up to a point, the Olympics, there was a clear commitment that local people should be used on those building projects and that training schemes would be put in place to ensure that they had those opportunities. Will that same commitment apply to HS2?
Definitely. A little later, I shall go on to my obligations under the paving Bill, which will, I hope, go some way towards reassuring the hon. Lady.
I am a strong supporter of HS2. It is a great relief to me that this country has seemingly, at long last, moved on from the apparent belief that the only material we could use in this country was aspic. We have to begin to restructure our national economy, to narrow the economic divide between north and south, and to break the golden magnet that is London and the south-east. If I look at my constituency now, before one shovel has gone into the earth, I see that those people upon whom my constituents depend—for example, to police our streets, to teach our children and to nurse us in our hospitals—can no longer afford to live there or near to their place of employment because of ever-widening earning inequalities. That is why it is vital that this project has cross-party support.
Along with every MP in this Chamber who has spoken today, I will detail the concerns of my constituents. They, in common with the constituents of everyone else who has spoken, have concerns about compensation and congestion. My constituents are particularly concerned about the idea of vast lorries going around highly populated streets, both residential and those with businesses, carrying spoil up ever-narrower roads—Adelaide road and England’s lane are the two favourites, but they are the roads along which these lorries should never travel. My constituents there and elsewhere in the constituency put forward the reasonable question: why can the spoil not be removed by rail?
We have seen an encouraging regrouping in respect of community concerns, as a group known by the acronym “SHOUT” has been formed. It comprises the tenants and residents of the Alexandra and Ainsworth estate—Rowley way—the Langtry estate and the Belsize residents association. They share common concerns, not only about compensation and congestion, which I have touched on, but about noise, destruction and the effects on several schools and the sheltered housing in the area, quite apart from the hundreds and hundreds of flats in those areas and the road closures that will take place during the construction of this essential beam in restructuring our national economies. We will also lose a nature reserve—two thirds of a hectare of woodland in which bats breed, and there are wintering birds and invertebrates. We know—it has already been proven—that the more densely populated the city, the more vital its green spaces are.
Both those who have formed SHOUT and the Queen’s Park residents association are most exercised about air vents—about shafts. Constituents of mine who are highly trained and skilled engineers have been saying to me that these vents could be moved elsewhere. The vent proposed for Queen’s Park would absolutely stop a multi-million regeneration project for that part of my constituency that could transform lives, and not just of the people who live in my constituency. I have never regarded any constituency as being an island entire unto itself. People live in my constituency and people from other constituencies work there—I have already touched on the point that we are all dependent on the services of others who may not live next door to us.
So I sincerely hope that the Government will take very seriously all the issues that have been raised here tonight. I also hope that they will give even more detailed information to my constituents, who are only too eager to put forward petitions, on how they can raise their concerns when, as we hope it will, the hybrid Bill Committee is sitting. That would allow for a genuine, open and transparent exchange about what my constituents can do to ensure that their concerns are listened to; that the improvements to our environments can be taken seriously; that the great regeneration projects are not kicked to one side; and, more importantly, that this railway goes ahead. It can transform not only London, but the entire United Kingdom.