The hon. Gentleman must ask the Leader of the Opposition why he gave an apology.

Edward Leigh Portrait Sir Edward Leigh (Gainsborough) (Con)
- View Speech - Hansard - -

With respect to the restoration and renewal of Parliament, I welcome yesterday’s announcement by the Commission, chaired by the Leader of the House, that it will take back control from the sponsor body and that all the figures that come out of the delivery authority and the sponsor body, on which I sit, should be published. Can he confirm that the figures for the delay, length and cost of decant are truly horrendous; that no work would be scheduled to start before 2027, although the building works need to be got on with now; and that we are talking of a decant in excess of 15 years and costs in excess of £14 billion? Will he therefore confirm that some of us have been proved right when we said that we should have got on with it years ago? Can we have an early resolution of the House so that we can resolve the matter, take back control and start the work now?

Jacob Rees-Mogg Portrait Mr Rees-Mogg
- View Speech - Hansard - - - Excerpts

My right hon. Friend raises some very important points. The Commission has asked that the figures be made available to all Members as soon as possible. The figures now range from £7 billion to £13 billion for the cost and from 12 years to 20 years for the decant. It seems to me that if we were to have a decant of 20 years, we would never come back to this Palace and that £13 billion or possibly even £14 billion of taxpayers’ money is not justifiable.

My right hon. Friend is also right that it has gone on for too long. We have been waiting for years for the perfect scheme instead of getting on with what we ought to do. He says it would be 2027 at the earliest, which is correct in part, but realistically it would probably be 2031, because the northern estate would have to be ready for people to move into it. I am glad to say that, with much thanks to your leadership of the Commission, Mr Speaker, we have been getting on with things before restoration and renewal that have been taken out of the scheme.

The Elizabeth tower is emerging butterfly-like from its chrysalis day by day to reveal an exceptionally beautiful part of the Palace. The fire safety programme has been proceeded with, so there are 4,126 sprinkler heads and 8 miles of pipe that are an important part of protecting life in the event of fire and are some protection for fire suppression that would be beneficial to the building.

By and large, the cast iron roofs have been restored in a very big programme as it is thought to be the largest expanse of cast iron roof in Europe. We are also getting on with the northern estate. It is really important that we get on with things and do them at a proportionate cost. We cannot possibly be out of here for 20 years; I do not think any Member thinks that is reasonable.