General matters Debate

Full Debate: Read Full Debate
Department: Leader of the House
Tuesday 21st December 2010

(13 years, 11 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Duncan Hames Portrait Duncan Hames (Chippenham) (LD)
- Hansard - -

Merry Christmas, Mr Deputy Speaker.

I rise to make a plea to the Department for Transport to rescue my constituents from their plight. I am referring not to the temporary difficulties caused by unexpectedly seasonal weather, but to the long-suffering of my constituents on overcrowded First Great Western services in some parts of my constituency, and to their suffering from the woefully absent services in other parts.

However, before I speak about that, I should like to raise the urgent matter of the forthcoming closure for refurbishment of the Chippenham driving test centre. The Under-Secretary of State for Transport, the hon. Member for Hemel Hempstead (Mike Penning), who has responsibility for road safety, has previously heard my calls for Wiltshire residents not to have to travel so far for a driving test. Many have experienced that difficulty since the closure of the Trowbridge driving test centre under the previous Government. However, should plans to close temporarily the Chippenham centre proceed in February, learner drivers in Wiltshire will have to travel as far as Bristol, Swindon or Salisbury. The good news is that the former driving test centre premises in Trowbridge are still available, and I urge the Minister to request that the Driving Standards Agency considers moving the Chippenham centre operation to Trowbridge during the period of those works.

I am always happy to offer solutions to the Government when I seek action from them, including in respect of the overcrowded trains to which I referred. Just over a month ago, the Transport Secretary set out his proposals for future rail investment, including one to cascade 650 additional carriages to the network outside London by March 2014. I should like to make the case for assigning even just one of those carriages to the trans-Wilts line, which links the five largest population centres in Wiltshire.

The line was a popular and well used service until the start of the current First Great Western franchise in 2006, when the requirement to provide a meaningful trans-Wilts service was dropped by the previous Government. Overcrowding is currently a serious problem on trains in and out of Bath. The problem is made worse because passengers cannot travel directly between Trowbridge and Chippenham—they are forced to re-route through Bath.

The Cardiff to Portsmouth line particularly suffers from overcrowding, as I told the Secretary of State following his statement. I am in no doubt that that line warrants some of those additional carriages. However, I suspect that without the benefit of some local knowledge, his officials could overlook the contribution that a single extra carriage assigned to the trans-Wilts line will make in alleviating the problem, since it will provide the direct route that is currently missing at all but the extremes of the day.

For example, at Melksham, there are currently only two train services each way a day, scheduled at deeply unhelpful times for commuters. A worker from Melksham who wishes to use those services to travel to work in Swindon would be obliged to work a 12-hour day before counting their travel time. To say the least, that is impractical. A single extra 153-class carriage would make possible four extra return services per day between Swindon and Salisbury. In due course, with a second 153 car, a regular and reliable hourly service throughout the day would be possible. At the same time, that would relieve pressure on overcrowded trains through Bath.

In the debate following the Secretary of State’s announcement on 25 November, he assured me that decisions to allocate those carriages will be determined not by the commercial position of franchisees, but by the wider economic benefits that extra capacity can bring. The trans-Wilts line can pass that test. For a start, there are no infrastructure constraints to expanding that service—no new track to lay, and no platforms or buildings to construct. There is passenger demand for such a service. Figures show a 10% growth in passenger numbers in west Wiltshire each year since 2005. The trans-Wilts service operated by Wessex Trains between 2001 and 2006 experienced strong year-on-year growth in passenger numbers, and more than 500,000 people live in the crescent between Swindon and Salisbury, which the line serves.

Indeed, the Wessex chamber of commerce and other local businesses have added their strong support for a service at economically meaningful times to connect the county’s population centres. The service would indeed support the footprint of the local enterprise partnership that is planned for Swindon, Wiltshire and Gloucestershire. Wiltshire council has plans temporarily to move offices to close to Melksham station next year, which would provide an additional boost to demand while the service establishes itself.

That is a strong economic case, and I must pay tribute to the TransWilts Community Rail Partnership, which continues to co-ordinate the campaign for better rail services in our area. Improving the trans-Wilts line is not a costly or high-risk proposition. It is simply a bid to regain a service that was popular and well used, and which should never have been removed from the franchise in the first place.

I do not make a habit of writing lengthy or over-optimistic Christmas lists. Some hon. Members will receive a shiny, high-speed train set for their constituents, but for me and the long-suffering commuters of Wiltshire one or two second-hand carriages would grant us our Christmas wish.