(11 years ago)
Commons ChamberI will not give way, for the simple reason that many of my hon. Friends and many Opposition Members want to take part in the debate—[Interruption.] The hon. Member for Huddersfield (Mr Sheerman) speaks from a sedentary position. I think it is fair to say that we have had many interventions from him today, so perhaps there might be a chance for someone else to have a turn.
The country needs this project because of all the important arguments: the greater connectivity; the fact that it is an engine for growth; the regeneration along the line of route; and, most importantly, the fact that it will deal with the capacity issue. I think that when High Speed 2 was announced in late 2008 and into 2009, little thought was given to its name. Those who took the decisions immediately called it High Speed 2, as they already had High Speed 1. Unfortunately, it is a misnomer that has, in some ways, led us up a cul-de-sac.
Of course, faster journey times are important, but they are not the most important thing. The most important thing is capacity. As I have said before, to echo what Tony Blair said in a different context, it is about capacity, capacity, capacity. The west coast main line will be full by 2024. We need capacity on the conventional railway for those who want to travel between London, Birmingham and Manchester but do not want to go along the whole route, and we need capacity to get even more freight off our congested roads and on to the railways.
My right hon. Friend and I had many discussions on this issue during his time as a Transport Minister. Yet again, we have come back to the idea that it is about not speed but capacity. Would he therefore support redesigning the line to run at a slower speed so that it could go around places such as Water Orton primary school, ancient monuments and people’s houses?
I heard my hon. Friend say that in an intervention on another of my colleagues. Let me tell him gently and in a spirit of friendship that, if one takes the line that he is suggesting, it will no longer be a high-speed train. In effect, it will be a parallel conventional rail line like the west coast main line. All the reports on having a conventional new rail line in parallel rather than a high-speed one show that it would cost about 90% of the cost of HS2 but without the benefits that high-speed railways bring.