High Speed Rail (Preparation) Bill Debate
Full Debate: Read Full DebateDan Byles
Main Page: Dan Byles (Conservative - North Warwickshire)Department Debates - View all Dan Byles's debates with the Department for Transport
(11 years, 1 month ago)
Commons ChamberI would like to draw the House’s attention to the Transport Committee’s detailed report on high-speed rail. It stated that
“only time will tell whether or not HS2 will, for example, help to rebalance the economy and reduce the north-south divide.”
It is a £50 billion project, yet we are told that “only time will tell” whether it will achieve its main aim.
Indeed; the hon. Gentleman is absolutely correct. We must not look simply at the HS2 line itself; we must also consider how its connectivity to other lines and other parts of the transport network can be developed.
If the principal benefit is now capacity rather than speed—this seems very much how the argument has moved—why not slow it down? If it is slowed down, we will no longer have the engineers I sit down with every week telling me, “We can’t go around Water Orton primary school because speed means it must be a straight line; we can’t go around ancient bluebell woods because speed means it must be a straight line.” If we slow it down, we will be able to avoid going over many of the sensitive areas on the route and perhaps even put in more stations.
The strategic review and other studies indicate that alternatives have been looked at and rejected. Network Rail states that more than 100 cities and towns could benefit from this development. Named in the various reports are places including Watford, Milton Keynes, Rugby and Northampton, but many more are possible. There is also a need to increase capacity for freight, which is as important as passengers. About 20 new freight paths can be developed, but I would view that as the absolute minimum.
I will not give way, for the simple reason that many of my hon. Friends and many Opposition Members want to take part in the debate—[Interruption.] The hon. Member for Huddersfield (Mr Sheerman) speaks from a sedentary position. I think it is fair to say that we have had many interventions from him today, so perhaps there might be a chance for someone else to have a turn.
The country needs this project because of all the important arguments: the greater connectivity; the fact that it is an engine for growth; the regeneration along the line of route; and, most importantly, the fact that it will deal with the capacity issue. I think that when High Speed 2 was announced in late 2008 and into 2009, little thought was given to its name. Those who took the decisions immediately called it High Speed 2, as they already had High Speed 1. Unfortunately, it is a misnomer that has, in some ways, led us up a cul-de-sac.
Of course, faster journey times are important, but they are not the most important thing. The most important thing is capacity. As I have said before, to echo what Tony Blair said in a different context, it is about capacity, capacity, capacity. The west coast main line will be full by 2024. We need capacity on the conventional railway for those who want to travel between London, Birmingham and Manchester but do not want to go along the whole route, and we need capacity to get even more freight off our congested roads and on to the railways.
My right hon. Friend and I had many discussions on this issue during his time as a Transport Minister. Yet again, we have come back to the idea that it is about not speed but capacity. Would he therefore support redesigning the line to run at a slower speed so that it could go around places such as Water Orton primary school, ancient monuments and people’s houses?
I heard my hon. Friend say that in an intervention on another of my colleagues. Let me tell him gently and in a spirit of friendship that, if one takes the line that he is suggesting, it will no longer be a high-speed train. In effect, it will be a parallel conventional rail line like the west coast main line. All the reports on having a conventional new rail line in parallel rather than a high-speed one show that it would cost about 90% of the cost of HS2 but without the benefits that high-speed railways bring.