(8 years, 11 months ago)
Westminster HallWestminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.
Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.
This information is provided by Parallel Parliament and does not comprise part of the offical record
I share my hon. Friend’s scepticism about the garden bridge. Like her, I wonder whether that money might be better spent. A whole series of projects in my constituency could use that £30 million well, and I want to draw the Minister’s attention to a couple of those.
On the garden bridge, which no one has ever asked me for, TfL intends to build the Silvertown tunnel in south-east London to relieve congestion at the Blackwall tunnel, but it says that local residents will have to pay for it through tolls, though no other river crossing in London has charges. Perhaps the garden bridge should have an entrance fee, so that it can pay for itself instead of taking money away from vital transport links that are needed in the rest of London.
Rather than getting into the detail of what may happen with the garden bridge, let me say that I would prefer to see that money reallocated to a series of other existing and necessary capital investment projects. If my hon. Friend will forgive me, I think the priority is Harrow, but I am sure that he will be able to make the case for south London well.
I come back to the concern that the £3 billion cut in funding in the spending review and the extra costs from the sub-surface upgrade programme might put other investment projects at risk. The Piccadilly line refurbishment is particularly important for many of my constituents who live in Rayners Lane, South Harrow and Sudbury Hill. Will the refurbishment programme for that line go ahead as planned? There has been much speculation about when, or if, the night tube will go ahead. Perhaps the Minister can give us an indication of whether it is at risk of cancellation or substantial delay as a result of those cuts. In the Minister’s intervention, he raised a point about fares revenue. The upgrade of the four lines in the sub-surface upgrade programme would have generated extra fares revenue that will now be lost, as more passengers will not be able to be carried until much later. Some estimates suggest that that could be as much as £270 million lost.
In the eight years in which the hon. Member for Uxbridge and South Ruislip (Boris Johnson) has been Mayor of London, fares have rocketed. Some of my constituents, such as those who travel from West Harrow on the Uxbridge branch of the Metropolitan line, have seen a 60% increase in the cost of travelling into central London. My constituents and others who live in outer London and use the tube regularly have been treated as a cash cow by the Mayor of London for too long. I am concerned that the loss of that £3 billion may increase the pressure on the Mayor, and/or future Mayors, to raise fares still further.
I am also concerned that further job cuts on Transport for London’s network, which are now inevitable, will further compromise the safety and security of passengers, including my constituents. TfL operational staff fulfil crucial operational functions as well as many safety-critical roles such as managing peak flows of passengers and handling emergencies. On the tube, DLR and Overground, adequate numbers of staff are needed to identify and respond to emerging crush situations.
Adequate numbers of staff are required to limit fare evasion, too, which is rocketing—it is up to £61 million a year following a reduction in staffing levels. I pay tribute to Greater London Authority Labour colleagues, led by the excellent Val Shawcross, Navin Shah and Len Duvall, for that information. Visible staff help to deter and detect crime, including people preparing for or engaging in acts of persistent serious crime and even—God forbid—terrorism. Staff also reassure passengers during tense periods such as now, but staffing is at its lowest level in recent history and Government cuts make it look likely that it will drop further.
Under plans for staff cuts at stations, Leytonstone station, which currently has four staff in peak periods, will be reduced to two members of staff—a 50% reduction at a station where there has already been a worrying terrorist incident. That is just a small indication of the worry that further job cuts, driven by the major cut in Government funding, might force on us.
I understand that London Underground Ltd now plans to cut a further 838 front-line staff positions from normal traffic hour operational levels. New staffing levels have apparently been derived from so-called business need schematics formulae, which do not incorporate the need for security checks or other operational needs. As a consequence, staff are required to meet the demands of security checks and will have to be removed from their allocated customer service positions for sizeable portions of their shifts to do so, leaving their areas unstaffed and effectively unmonitored on occasion. That is a concern. Will the Minister be willing to review with Transport for London’s managing director whether the loss of those front-line staff is a sensible way forward and whether alternatives might be found?