(8 years ago)
Commons ChamberI can save myself and my office a phone call today by telling the hon. Lady I will be visiting her constituency and her airport tomorrow to make precisely the point about the importance of regional connectivity. [Interruption.] No, I probably will not have a spade with me; I do not think Newcastle airport wants me digging it up.
I want this to move ahead as quickly as possible. There is a statutory process we have to follow. There is then a detailed period of design. This has always been something that will be ready for the middle of the next decade. I would love to wave a wand and have it quicker than that, but these things take a long time to design and construct, quite apart from the regulatory process. I know, however, that everybody involved will want to move as quickly as possible.
This is the right decision for Wales, as it is for the whole of the UK. Will my right hon. Friend say a bit more about what specific powers are available to him and whether he needs to seek further powers to ensure this becomes an outstanding example of British procurement, so that we maximise opportunities for our labour pool, supply chain and, not least, the steel industry?
I have been very clear, and this drives to the heart of the debate about costs. I understand the point made by some of the airlines about wanting to ensure that the best possible value is delivered in this project, because ultimately the cost is borne by their passengers. I want to see the maximum possible benefit across the UK. I have extended to the Civil Aviation Authority the power to have a strong supervisory role over this process, not to dictate how the project is designed in detail, but to make sure that there is value at the heart of both the supply chain and the contracting. I want to make sure that this is a value-for-money proposition and that it delivers what we need at a price that is right for passengers.