(5 years, 10 months ago)
Commons ChamberUrgent Questions are proposed each morning by backbench MPs, and up to two may be selected each day by the Speaker. Chosen Urgent Questions are announced 30 minutes before Parliament sits each day.
Each Urgent Question requires a Government Minister to give a response on the debate topic.
This information is provided by Parallel Parliament and does not comprise part of the offical record
What I have done is insist on a highly substantial commercial arrangement with two very established cross-channel ferry operators and given a small amount of business to a new operator. If there is a no-deal Brexit, which I hope will not happen, we have several other measures that we can bring into place.
Will my right hon. Friend assure the House that he is in consultation with not only Dover and Calais but other ports about what would happen in the event of no deal, which I sincerely hope will not happen? The way to avoid no deal, of course, is to vote for the deal. In Taunton Deane, many businesses, lots of them small, rely on exporting and ferries. They must not be hampered and we must act responsibly to give them assurances.
The clearest assurance that I can give is that I have been to Calais and met my French counterpart to talk about this issue, I have met the president of the Nord-Pas-de-Calais, and officials have had discussions, and I have had no sense from any of those conversations that the French want anything other than to maintain the fluid movement of trade through the channel ports. That is something to which we should all aspire.
(6 years, 4 months ago)
Commons ChamberOne thing that would reduce road congestion is, of course, getting people out of their cars and on to their bikes. We very much welcome the upgrade of the A358 in Taunton, but does the Secretary of State agree that whatever route is chosen by Highways England, the provision of adequate cycling infrastructure should very much be part of upgrades?
I always hope that when a new road is put in place, provision will be made for other users—cyclists and pedestrians—alongside that road, particularly in respect of a major road like the A358. That new road will of course mean that there is substantial additional capacity on the old road, which will become much less congested, but I am sure that Highways England will be looking carefully into how it can make provision for all road users.
(6 years, 9 months ago)
Commons ChamberAs the hon. Gentleman will know—and I have given this assurance to my hon. Friend the Member for Stoke-on-Trent South (Jack Brereton)— I am acutely aware of the issues in Stoke-on-Trent. I want to ensure not only that the high-quality service that it deserves is protected, but that HS2 trains run through it, which is also what it deserves. I have given that clear commitment to the people of Stoke. I want them to have a first-rate rail service, and HS2 will make it possible for them to have an even better rail service than they have at present.
Let me say more about the affected communities. Last week we announced an additional £5 million for communities and businesses that are disrupted by the construction of phase 2a, which can be spent on public projects, community centres and so forth. That will add to what we have already committed in terms of the mitigation and compensation in place, and we will carry on looking at ways in which we can minimise the impact on local people and the areas affected.
I am totally in favour of the project, as train travel is environmentally friendly because it gets people out of their cars and on to trains. But will the Secretary of State reflect on the potential loss of ancient woodland because of HS2, and whether consideration might be given, where possible, to using tunnels so that we keep these wonderful, magnificent trees? We have only 2% of them left in the whole country. Will we consider doing this? If not, and if there is unavoidable loss, could we consider 30% amelioration, as recommended by Natural England, rather than the figures bandied about today?
I am very well aware of the potential impact on ancient woodland. We have already made changes to the design of the project to try to mitigate that impact, and there is an absolute commitment to look to plant afresh and to develop environmental measures to compensate for any loss of woodland. Also, there are some exciting potential projects on the route that can enhance the natural environment at the same time as we are having to make changes elsewhere. I assure my hon. Friend that we are very sensitive to the issue she mentions, and we will do our best to make this project in as environmentally friendly a way as possible. We cannot build something new like this across the whole country without having some impacts, but we can try to mitigate them and put money into positive alternatives. That is what we are committed to, and that is what we will do.
This is a step on the way towards creating a 21st century new rail network: phase 1 to Birmingham, phase 2a to Crewe, eventually phase 2b to Manchester and Leeds, and then across the top with Northern Powerhouse Rail, and then, through that, the connections to the north-east, which the shadow Secretary of State will hold dear, to Scotland—colleagues on both sides of the House representing Scottish constituencies are keen to see that connection put in place—and into north Wales through the Crewe hub that we are working on at the moment.
This project will provide the capacity our transport system needs in the 21st century. It will deliver better journey times and, particularly importantly, much better connections between our northern cities—Birmingham, Sheffield, Leeds—where there are poor connections at the moment; this will make a huge difference to them. But above all this is about making sure this country has a 21st century transport system. I hope the project commands support across the House. I know that some Members have issues both about the principles of the project and constituency impacts. To those with constituency impacts I simply say again that we will do our best to minimise those and to work as closely as possible with them to make sure that people who are affected are treated as decently as possible.
This Bill is enormously important to this House, to the future of this country, to our nation, to strengthening our Union, and to delivering economic growth across the whole country, and I very much hope that this House will give it its support today.
(6 years, 9 months ago)
Commons ChamberThe only station that I am going to be leaving is Euston station for a visit to the midlands this morning. There has been no £2 billion bail-out of Virgin Trains East Coast. The contracting with Carillion was actually not with Carillion, but with a consortium of companies that are equally responsible for delivering the contract and will do so. I am happy to stand here to defend the record of a Government that have done more for our transport system than has happened in decades. That is in sharp contrast with what the Labour party did over 13 years in government, which was very little indeed.
Figures for transport spend in the south-west show a significant increase—part of a pattern, Mr Speaker—totalling £1.7 billion in 2016-17 alone. That spend is helping to deliver a package of investment worth over £2 billion on the strategic road network in the south-west, as well as investing more than £400 million in the rail network.
I very much welcome the commitment to funding for the notorious A358 in my constituency, and I am pleased that the Secretary of State and Highways England listened to local concerns and my calls for a new consultation, which opened just this week with three proposals. However, I would like an assurance that the upgrade will deliver not only strategically, but for local people and for productivity in Taunton.
(7 years ago)
Commons ChamberThere is a two-stage programme of modernisation for rail in the north, despite the nonsense that the shadow Secretary of State was talking earlier. Initially, we are replacing every single train in the north. We have modernised the Calder Valley line and are about to launch the modernisation of the main trans-Pennine route between Leeds and Manchester.
Of course we have done other things, such as electrifying the railway line from Liverpool to Manchester and creating the first ever link between Manchester Victoria and Manchester Piccadilly. A whole range of things is happening. What we said at our conference and will be confirmed at the Budget is that we will set aside funding to create the links between HS2 and Northern Powerhouse Rail. I am now waiting for the detailed Transport for the North proposals for Northern Powerhouse Rail. In the short term, we modernise the trans-Pennine route, and in due course we will build Northern Powerhouse Rail to ensure that we have those better links for the future.