High Speed Rail (London – West Midlands) Bill Debate

Full Debate: Read Full Debate
Department: Department for Transport

High Speed Rail (London – West Midlands) Bill

Caroline Spelman Excerpts
Monday 28th April 2014

(10 years, 7 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Caroline Spelman Portrait Mrs Caroline Spelman (Meriden) (Con)
- Hansard - -

The hon. Lady mentioned the journey time to Curzon Street, but I am sure she is aware that the journey time from London Euston to Birmingham international will go down to 31 minutes. That will result in an under-utilised runway becoming competitive with some of the London airport runways, which could help relieve congestion in the south-east.

Mary Creagh Portrait Mary Creagh
- Hansard - - - Excerpts

That is a very important point. The impact on western Coventry and Birmingham international airport cannot be overstated. When I was 18, the journey time from Coventry to London was two hours, and the £9 billion upgrade has got that down considerably to an hour. To reduce it still further would be a phenomenal achievement in one’s own lifetime.

--- Later in debate ---
Caroline Spelman Portrait Mrs Caroline Spelman (Meriden) (Con)
- Hansard - -

My constituency gets both the pain and the gain, because in having the first station outside London, we will undoubtedly benefit from some of the 30,000 permanent jobs that it has been estimated will come. But I cannot stress enough the greater importance of the need for extra freight capacity. I invite hon. Members when travelling on our motorways to look at the number of car transporters that are being forced to take these valuable export goods to our ports by road because of the lack of freight capacity.

Given that my constituency is under such pressure for development, as most of it is in the green belt, I have a No. 1 ask of the Secretary of State: for a tunnel under Balsall Common, so that the parish of Berkswell should not be severed in two by a 40-foot flyover where High Speed 2 has to cross over the west coast main line. The impact on that community will be severe. Primary school pupils will not be able to get directly to the secondary school and a village with only one shop will effectively be cut off from other local services.

High Speed 2 runs through the Blythe river valley, through Arden pasture land in my constituency, and is therefore prone to flooding, so viaducts are needed. In common with other hon. Members who have low-lying land where viaducts are needed, I urge the Secretary of State to heed the requests of the communities in the design of those viaducts, so that the view in those river valleys is not completely obliterated by bunds or unnecessarily dense structures.

Many of the roads in Arden pasture land are twisty and small, and quite unsuitable for construction traffic. I urge the Secretary of State in particular to prevent Water Orton road from being used to haul spoil to protect the village of Castle Bromwich, and to close small lanes such as Diddington lane, which would otherwise become potential rat runs. In response to a point made by the hon. Member for Hampstead and Kilburn (Glenda Jackson), perhaps the Department would consider the use of the canal network, which after all goes very close to Euston and goes right through my constituency, as an environmentally friendly means of removing spoil from those areas.

I welcome the revised compensation package, particularly the announcement of a taper on the distance at which properties are eligible for compensation, in response to amendments that I tabled to the paving Bill. However, there is one glaring omission that will affect all on the line of route: there is no compensation for properties affected by construction works. Given that my constituency will have the first station, we are likely to see five and half years of construction work, and the homes affected by that will be every bit as blighted as properties right next to the tracks. I urge a rethink in that area.

Originally, a High Speed 2-High Speed 1 link was proposed. I understand why that proposal has been scrapped, but the regions were led to believe that there would be through trains. I ask the Department to look again at how that might be achieved with a twin-bore tunnel to Stratford, so that an international passenger can land at Birmingham airport, clear immigration and get a through train to the continent.

I support the view of my local authority, Solihull council, that a community fund, like that for Birmingham airport, would allow local administration of mitigation measures, which would give a sense of local empowerment. I have put my name to an instruction of the Environmental Audit Committee, of which I am a member, to look again at the environmental impacts. I particularly want to point out that, when I was Secretary of State for Environment, Food and Rural Affairs, our aspiration, as set out in the “Natural Environment” White Paper, was a net positive outcome from biodiversity offsetting. I am disappointed to see a less ambitious objective for High Speed 2 of no net loss, and I ask the Government to look again at that.

I have had to balance conflicting views in my constituency, but I heeded the warning by Lord Adonis when he visited the west midlands and said that if it was not clear that Birmingham and Solihull and the west midlands wanted a stop along the line, the west midlands could be bypassed and the line could go straight to Manchester. That is why I have sought to get the best mitigation and compensation possible for my constituents.