Waste Incineration Facilities

Caroline Nokes Excerpts
Tuesday 11th February 2020

(4 years, 2 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Caroline Nokes Portrait Caroline Nokes (Romsey and Southampton North) (Con)
- Hansard - -

Thank you, Sir Roger. I congratulate the hon. Member for Washington and Sunderland West (Mrs Hodgson) on securing this important debate. Her parting shot was that her constituents do not want an ecological eyesore as their new landmark, and my constituents feel exactly the same way about the proposals to build a giant incinerator between the villages of Longparish and Barton Stacey. Only two weeks have passed since we last debated this subject, and it is right that we should do so again, because the Minister did not have time to respond. It is imperative that she should have the opportunity to give a fuller answer than she had time to do last time.

I regret to have to rehearse the issue we face in Romsey and Southampton North, where American conglomerate Wheelabrator seeks to build a massive, industrial-scale incinerator the size of Battersea power station in the Hampshire countryside. Billed by the applicants as a green waste-to-energy scheme, locally there are serious doubts that a proposal such as this can ever be green. So enormous is the development that it is to be determined by the Secretary of State—it is classified as a nationally significant infrastructure project—rather than by the local waste and minerals authority, Hampshire County Council or the local borough council, Test Valley Borough Council. I commend both those councils for being resolute in their opposition to it.

I will not rehearse the many good planning reasons why the scheme should be refused, but there are serious questions about whether it will ever generate the amount of power required to achieve the level of a national infrastructure project. On its website, Wheelabrator proudly proclaims that the scheme will have an energy generating capacity of up to 65 MW, but in public consultations with residents, the company has acknowledged that that is entirely dependent upon the calorific value of the feedstock. We know we have to get better at removing plastics from the waste stream, and those plastics have some of the highest calorific values when burned. I commend the steps the Government have taken so far, but much more can and must be done.

I visited a packaging manufacturer in my constituency with the Minister’s predecessor, the right hon. Member for Suffolk Coastal (Dr Coffey)—we look terribly attractive wearing blue hairnets. The company’s managing director kept making the point that they wanted to use high-quality recycled plastics in their packaging, but it was too difficult to get hold of them. They used a percentage of recycled, but it was easier and cheaper to get fresh plastics than to extract plastics from the waste stream. They wanted Government action to ensure that the plastics that we all know are in the waste stream can be redirected into businesses such as theirs.

Peter Grant Portrait Peter Grant (Glenrothes) (SNP)
- Hansard - - - Excerpts

In Scotland, any new incinerator is required by law to remove all metals and plastics from the waste product before it is incinerated. Would the right hon. Lady welcome similar legislation in England?

--- Later in debate ---
Caroline Nokes Portrait Caroline Nokes
- Hansard - -

It is critical that we redouble efforts to ensure that anything that can be reused and recycled is extracted from the waste stream, whether metal or plastic. At Barton Stacey Primary School, the children have embraced the message we heard a few weeks ago in another room in Parliament, when a giant Womble urged us to repair, re-use, recycle and reduce. We have to keep striving to reduce the amount of material going into the waste stream.

Two weeks ago, I raised the issue of an incineration tax. I do not recall whether the Minister responded to that point, but I fear she did not, so perhaps she can today. Before I came to this place, I was a borough councillor in Test Valley. I always said I represented the ward with the most landfill sites—existing, former and proposed. Landfill is subject to a tax, and it is absolutely right that the next step up the waste hierarchy should be similarly taxed. The Budget statement of October 2018 included a reference to the consideration of an incineration tax. The time for consideration has passed.

Turning to emissions—I recognise that I only have a minute left—we all recognise that the EU relatively recently tightened regulations governing permitted levels of emissions from incinerators, but is the Minister content that being within permitted levels is good enough? Where is the aspiration and ambition? Surely, at a time when we are seeking to improve air quality, we should be looking to reduce the levels of emissions that are allowed. I have lost count of the number of times over the last three and a half years that we have been told that leaving the EU will provide us with opportunities. Surely, this is one area in which we can go further and faster than would otherwise have been allowed. We must do more and not slip back into the lazy argument that development will be allowed only within current regulations.

When it comes to monitoring emissions, the Environment Agency technique has been to sample test. The new BAT—best available techniques—measurements appear to require continuous monitoring. Certainly, should the abomination in my constituency go ahead, local people will demand continuous monitoring of key pollutants and an assurance that the EA will hold companies’ feet to the fire—apologies for the pun—to ensure that they abide by those standards.

The World Health Organisation indicates that there is no such thing as a safe level of particulate matter in our air, and that is echoed on the Department for Environment, Food and Rural Affairs website. The particulate plume from the proposed incinerator in my constituency would cover the primary schools of Barton Stacey, Longparish, Wherwell and Stockbridge, and many other primary schools in the constituencies of my hon. Friends the Members for Winchester (Steve Brine) and for North West Hampshire (Kit Malthouse).

We have declared a climate emergency. We have bold ambitions, through the Environment Bill, to make radical strides forward in creating a cleaner and greener environment for ourselves, our children and generations to come. We cannot do that if we keep pumping pollutants into our atmosphere. I urge the Minister, who I believe genuinely cares about these issues, to ensure that she has as tight a grip as possible on our future waste strategy so we simply do not keep doing that.

--- Later in debate ---
Caroline Nokes Portrait Caroline Nokes
- Hansard - -

Will the Minister give way on that point?

Rebecca Pow Portrait Rebecca Pow
- Hansard - - - Excerpts

Very briefly.

Caroline Nokes Portrait Caroline Nokes
- Hansard - -

I respectfully point out that the Minister has 12 more minutes. This issue is important. We heard the comment in the October 2018 Budget statement, and we have heard the Minister’s comments on it now. Is she prepared to put a timescale on that?

Rebecca Pow Portrait Rebecca Pow
- Hansard - - - Excerpts

No. Processes will be followed. So much of what is coming down the tracks, through the resources and waste strategy and the Environment Bill, should introduce a paradigm shift in the way we treat waste. The intention is that a tax may never need to be introduced, but one will have to watch the direction of travel and whether we are really cutting down on waste, because that is the intention before we ever have to introduce a tax.

As Members pointed out, incinerating has a carbon impact, but the evidence available is that the carbon impact of most mixed waste streams commonly sent to energy-from-waste plants is lower than if we sent it to landfill. Every day that passes brings new advances in carbon capture, and I am pleased to report that the Government will invest £800 million in this technology to deploy the first carbon capture clusters by the mid-2020s.The technology could potentially be applied to energy-from-waste plants to capture the carbon emissions from incinerating waste, thereby reducing carbon dioxide emissions even further. I point out, because the shadow Minister mentioned this issue, that all municipal waste incinerators are combined heat and power-enabled. Only nine deliver heat, but they all supply electricity.

The Government are clear that energy from waste should not compete with greater waste prevention, reuse or recycling. Currently, England has enough operational energy-from-waste capacity to treat about 38% of residual municipal waste, including a proportion of commercial and industrial waste. The majority of the 40 or so existing plants use conventional incineration with energy recovery, as that is tried and tested, but other technologies, such as pyrolysis and gasification, could achieve greater efficiencies, reducing environmental impact and delivering outputs beyond electricity generation. This is a changing space, and science is obviously benefiting the sector. Nevertheless, for the foreseeable future, conventional energy from waste will continue to have an important role in diverting waste from landfill, and it is the best option for most waste that cannot be reused or recycled.

I mentioned on 28 January that the Government are working to drive greater efficiency of energy-from-waste plants. That is largely through Department for Business, Energy and Industrial Strategy initiatives and it includes encouraging use of the heat that the plants produce, in addition to the electricity generated. The Government have in place other, wider measures that help to draw waste away from landfill and incineration. There is an opportunity to deliver significant greenhouse gas savings by converting the wastes into transport fuel, for example. Through the renewable transport fuel obligation—that is quite a mouthful—the Government incentivise the use of organic waste such as cooking oil and food waste to produce renewable fuels. The Department for Transport is examining the potential to support innovative waste-to-fuel technologies that have the capacity to produce advanced fuels, including even jet fuel.

Many hon. Members touched on regulation. Energy-from-waste plants in England are regulated by the Environment Agency and must comply with the strict emission limits set down in legislation. That includes plants using gasification technology. Every application for a new plant is assessed by the agency to ensure that it will use the best available techniques to minimise emissions and that it will not have a significant effect on local air quality. The Environment Agency will not issue an environmental permit if the proposed plant will have a significant impact on the environment or will harm human health.

--- Later in debate ---
Rebecca Pow Portrait Rebecca Pow
- Hansard - - - Excerpts

I am going to plough on, because I want to get some of the points across that I could not make last time.

As the planning application referred to by the hon. Member for Washington and Sunderland West is subject to an appeal, it is the role of the Planning Inspectorate to consider all the material planning considerations that are relevant to the case, and from all parties, including the local planning authority, the applicant and those who might have made representations on the application—and of course all those people who signed the petition. However, I note the request made to my right hon. Friend the Secretary of State for Housing, Communities and Local Government for him to recover the appeal for his determination. As it is a live planning appeal, I am sure the hon. Member understands that it would be inappropriate for me to comment further.

Once operational, energy-from-waste plants are closely regulated through a programme of regular inspections and audits carried out by the Environment Agency, which also carefully considers the results of the continuous air emissions monitoring that all plants must do to meet the conditions of their environmental permit.

The hon. Member for Edmonton (Kate Osamor) raised the issue of air quality in particular, but air quality is of course devolved to local authorities, and the Greater London Authority is responsible for what happens in London. However, energy-from-waste plants must report any breaches in respect of emissions to the EA within 24 hours, so there are strict controls.

Health issues were touched on in particular. As part of the permitting process, the Environment Agency consults Public Health England and the local director of public health on every energy-from-waste application that it receives and takes their comments into account when deciding whether to issue a permit. I must point out that our clean air strategy has been commended by the World Health Organisation, and there are aims in it to halve any harm caused to human health by air quality. We therefore have strict controls coming down the tracks, and local authorities are all becoming engaged with them. Hon. Members should note that the position of Public Health England-remains that modern and well run and regulated municipal waste incinerators are not a significant risk to public health. That is what that body itself has said.

Caroline Nokes Portrait Caroline Nokes
- Hansard - -

Will the Minister give way?

Rebecca Pow Portrait Rebecca Pow
- Hansard - - - Excerpts

Very briefly.

Caroline Nokes Portrait Caroline Nokes
- Hansard - -

My hon. Friend appears to have only one page of her speech left, so I am sure we have plenty of time for her to read that out. I am conscious that she has made many comments about municipal waste facilities, but unfortunately the proposal in my constituency is not for a municipal one but for an entirely commercial one. Although I accept her reassurances about current standards and EA monitoring, does she think that that goes far enough?

Rebecca Pow Portrait Rebecca Pow
- Hansard - - - Excerpts

Of course there is a place for commercial waste incinerators, which is what my right hon. Friend refers to. We have in place an entire system of structures, permits, and checks and balances, but it is essential that they are seen to function properly and that they are monitored closely and conducted in the right way.

To conclude, I thank the hon. Member for Washington and Sunderland West for bringing forward this debate. This clearly is a heated issue, which has raised a lot of concerns, but I hope I have made it clear that harnessing energy from residual waste has its place as part of a wide, holistic waste management system. That will deliver value from waste as a resource. I wanted to be very clear, and I hope it has come out in what I have said, that the measures in the resources and waste strategy and the Environment Bill will enable a paradigm shift, in relation to reducing, reusing and recycling our waste, that should limit the amount that ever has to go to incineration and landfill. I hope that, from what I have said, hon. Members understand what is happening, the direction that the Government are absolutely committed to, and the move to a circular economy.