Calum Kerr
Main Page: Calum Kerr (Scottish National Party - Berwickshire, Roxburgh and Selkirk)(8 years, 1 month ago)
Public Bill CommitteesNo, I do not, but I do think it is useful for the period in which contracts can be cancelled to be limited. The law currently provides for that.
Amendment 84 seeks to define the parameters of any general condition that Ofcom sets regarding compensation to customers. It is our intention that providers should offer prompt and proportionate compensation when their services do not meet agreed standards. It is right that any decision by Ofcom to set general conditions needs to be based on evidence drawn from its consultation process and applied proportionately. In June, Ofcom issued a call for input on the aim and scope of the automatic compensation scheme, and it will consult on the introduction of the regime in early 2017. We support Ofcom in that approach. I think that the way the clause is drafted is the right way to drive the policy, but until we have the benefit of Ofcom’s consultation, it would be wrong to constrain the parameters of a general compensation condition.
With that explanation, and given my point that there is already a time-limited period in which contracts can be cancelled, I hope that hon. Members will withdraw their amendments.
I am disappointed but not surprised that the Minister will not consider the change. There seems to be an unwillingness to amend the Bill other than by adopting one of the hundreds of Government amendments. I hoped that we might enter into a more constructive spirit.
We agree that the clause itself is a good move. As I said in my opening remarks, there is an opportunity to go to a high level of granularity—I contrasted the black-and-white, binary nature of telephony to the complex world of broadband—and I would like the Minister to assure us that the devolved Administrations will play a key role in that. Scotland is a disproportionately rural environment, and we must ensure that the rural voice is heard, although these issues are not unique to Scotland, or to my constituency, or that of my hon. Friend the Member for Inverness, Nairn, Badenoch and Strathspey. This must go to a granular level and incentivise good performance, rather than provide compensation, as is currently set out in the Bill. All that our constituents want is a good level of service, rather than some money back for poor service.
Clause 4 contains changes to the highly complex electronic communications code, as we heard earlier in the debate. We recognise and support the amendments tabled in the Minister’s name, which seek to clarify the web of legal technicalities and ensure that it interconnects with the existing legal landscape; that the new code does not infringe on access to land where the person does not agree to that access being obstructed; and that subsisting agreements continue in place.
Our primary concern is to ensure that the significant savings that the clause will clearly create for the mobile industry are invested in their entirety into infrastructure and roll-out for the public benefit.
We would also like to explore what consideration has been given to how we can ensure that independently-owned infrastructure can have a significant role in the sector and, if possible, make up a larger proportion of our infrastructure in line with the global market. The much-discussed difficulties of the broadband roll-out highlight the issues when infrastructure is owned by a private monopoly. We should seek to break up this market as much as possible. For that to happen, investment incentives for independent infrastructure need to be maintained as they are under the current ECC.
The assets of these small infrastructure providers, which are a valuable part of the market, are dependent on land. We would like a commitment from the Minister that further inevitable redrafts continue to carve out electrical communications apparatus from the definition of land. The benefit of independent infrastructure is the much higher capacity available for all networks to use on an open and non-discriminatory basis. Operators in this space filled more substantial towers, which send signals much further than an average mobile operator-owned mast. That is particularly important in rural areas, where more than half their investments have been made. More networks operating from better infrastructure enable transformational improvements in capacity.
The sector also unlocks significant new inward investment with a low cost of capital from the same funds that invest in UK energy, transport and utility assets. Clearly, significant investment is needed in the UK’s wireless infrastructure. Improving mobile connectivity needs substantial and sustained investment. New communication masts are needed in rural and suburban areas to improve coverage. In urban areas, to support the exponential growth in mobile data usage and provide ubiquitous high-speed connectivity, 5G networks will need hundreds of thousands of small cells connected with a dense network of fibre.
Analysis from Ernst & Young highlights that independently operated towers across Europe and North America host, on average, twice as many networks as vertically-owned towers. The UK is now lagging behind competitive telecoms markets around the world in respect of adopting the more efficient independent model; more than 60% of global and 80% of US masts are now operated independently of the networks that use them. Independent infrastructure can deliver investment in a way that maximises its productivity and enables the greatest level of connectivity.
Furthermore, we are aware that the industry has concerns about the clause given what is known as “stopping up”. That is the procedure that highway authorities use to decommission stretches of public highway. Under the new code, when streets are stopped up, the occupier of the land can give notice to quit and mobile operators would not then be able to cover the cost of relocation.
As I understand it, unlike the other reforms, this reform is intended to apply retrospectively, so we would be interested to hear the Minister’s thinking. More broadly on the clause, clearly the Minister and officials are attempting to make revisions to this enormously complex code, which obstructs or interferes with the means of access to this land.
There is a broader point. Despite the additional powers that the Bill provides to telcos over the landowners, in practice there absolutely must remain a solid working relationship between the two. As we heard in evidence last week, if good relationships are not continued, the industry might as well just go home for the next four to five years and forget about further expanding the network, such is the importance of good relationships and access to allow for upgrading and installing new infrastructure.
Industry evidence suggests that, on average, infrastructure facilities will need to be accessed every 12 days, so we must ensure that the legislation strikes the right balance between increasing access, which will help to upgrade the network, and maintaining a good relationship with the landowners who will help that roll-out.
The clause is intended to improve mobile coverage, so I will go back to something that the Minister said on Tuesday in Committee:
“That is why delivery on this commitment by the MNOs”—
that is, by the mobile network operators—
“is so important. The deal as agreed, which is a legally binding commitment, will result in nearly 100% of UK premises receiving 3G/4G data coverage, and 98% coverage to the UK landmass by the end of 2017.”—[Official Report, Digital Economy Public Bill Committee, 18 October 2016; c. 124.]
Those figures were not immediately familiar to me at the time. As I understand it, they were not in the legal agreement between the Government and the mobile network operators, which only requires guaranteed voice and text to each operator by 2017 to 90% and full coverage to 85% by 2017.
I believe that the Minister may have been referring to the new emergency service contract, which is being delivered by EE. That is exactly the point I was making: that is only one operator. Furthermore, is it not the case that currently only 46% of premises have access to 4G from all mobile network operators and that there remains a substantial 7%, or 1.5 million homes nationwide, that do not have basic voice or text coverage across the three networks?
The roll-out of this vital infrastructure by EE for the benefit of emergency services is obviously welcome and the coverage figures for the UK landmass are impressive. However, that does not constitute universal coverage, as it will be only for the benefit of EE customers, unless some kind of agreement that we are not aware of has been reached. Clearly, although that means that data coverage is reaching all corners of the UK, there is no parity of provision across the mobile network operators and that near-universal coverage, which is so needed, is still far from a reality.
New clause 20, to which we will return later, seeks to do something about that. It would empower the Secretary of State to commission a strategic review of mobile network coverage and to consider measures to enable universal coverage for residences across all telecommunications providers. That would enable the Government to take a second look at ways, including national roaming, genuinely to extend coverage across 3G and 4G to all network providers, because, as the Minister said in Committee on Tuesday, it is no good having full coverage with one provider if the others are not covered.
That was an excellent introduction from the Opposition spokesperson, highlighting a lot of the issues. I will try not to repeat them.
What I will do, however, is start by welcoming these overdue changes to the electronic communications code. We absolutely need to make it much easier for infrastructure to be rolled out—not just for masts; this also applies to the likes of Virgin, which is very concerned about wayleaves and access and how it can roll out wire networks. We very much welcome anything that will help increase coverage across the whole of the UK, and in particular across Scotland.
Spectrum licensing is our most effective tool for ensuring we get the coverage model we want. The form of the code will help, but it is through licensing that we will drive the level of coverage we want. Will the Minister confirm that the Government will leave nothing off the table in that? One option might be taking back spectrum where appropriate—for example, in rural areas that cannot be covered, as has happened in the US.
Of course, the management of spectrum needs to be as efficient as possible. The new dynamic spectrum management in clause 8, which we just agreed to, will help to deal with white space—spectrum that is not used but could be. New technology allows that to be used far more efficiently. I am delighted that we got unanimous support for clause 8. On clause 9 and setting out a set of strategic priorities, I am sure that the hon. Gentleman’s comments will be taken on board.
Question put and agreed to.
Clause 9 accordingly ordered to stand part of the Bill.
Clause 10
Penalties for contravention of wireless telegraphy licences
The amendments will amend the Wireless Telegraphy Act 2006 to extend the time limit for bringing prosecutions for some summary offences—for example, those relating to unauthorised use of wireless telegraphy equipment. Amendment 10 makes provision about when proceedings in Scotland are deemed to have commenced for the purposes of the extended time limits. Amendments 8, 9 and 11 make minor changes to clarify the drafting.
Some of the amendments specifically relate to the law in a way that goes back to my earlier point. Will the Minister confirm whether the Scottish Administration have been consulted on this issue, given that it is clearly a devolved matter?
Yes—although I have had no discussions with them at a ministerial level about the amendments, I understand that discussions have taken place between officials. The effect of the amendments will be to make the law work better, so I hope they will have cross-party support.
Amendment 8 agreed to.
Amendments made: Government amendment 9, in clause 14, page 17, line 18, leave out “Subsections (3A) and (3B)” and insert
“Section 41(7) and subsection (3B) above”.
Subsection (3C), inserted in section 107 of the Wireless Telegraphy Act 2006 by the clause, lists enactments displaced by the time limits mentioned in subsections (3A) and (3B). Subsection (3A) merely refers to section 41(7), and the amendment substitutes a direct reference to that provision for the reference to subsection (3A).
Government amendment 10, in clause 14, page 17, line 26, at end insert—
“(3D) In relation to proceedings in Scotland, subsection (3) of section 136 of the Criminal Procedure (Scotland) Act 1995 (date when proceedings deemed to be commenced for the purposes of that section) applies also for the purposes of section 41(7) and subsection (3B) above.”.
The amendment adds provision about when proceedings in Scotland are deemed to be commenced for the purposes of the time limits in section 41(7) and new subsection (3B) of section 107 of the Wireless Telegraphy Act 2006.
Government amendment 11, in clause 14, page 17, line 31, at end insert—
“() for subsection (8) substitute—
“(8) For further provision about prosecutions see section 107.””.—(Matt Hancock.)
Existing section 41(8) of the Wireless Telegraphy Act 2006 applies to section 41(7) and is superseded by section 107(3C) inserted by the clause (see amendment 9). Amendment 10 also inserts provision applying to section 41(7) into section 107. Amendment 11 therefore substitutes a subsection referring the reader to section 107.
Clause 14, as amended, ordered to stand part of the Bill.
Clause 15
Internet pornography: requirement to prevent access by persons under the age of 18