Debates between Barry Sheerman and Kelvin Hopkins during the 2017-2019 Parliament

High Speed 2

Debate between Barry Sheerman and Kelvin Hopkins
Wednesday 10th July 2019

(4 years, 10 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Kelvin Hopkins Portrait Kelvin Hopkins (Luton North) (Ind)
- Hansard - - - Excerpts

It is a pleasure to serve under your chairmanship, Mr Hosie. I congratulate the right hon. Member for South Northamptonshire (Andrea Leadsom) on securing this important debate, and on her excellent speech, with which I strongly agree.

I state categorically that I believe passionately in our railways; I have been a daily commuter for 50 years and I have always believed in their future. I continue to support strong investment in our railways, but not in HS2. The alleged business case for HS2 has two essential components: cost and need. The costs have been ballooning, dwarfing the claims of £50 billion by multiples. Even the rumoured likely costs now are way below what an eventual bill would be. With more time, I could give some explanations as to why, but I wish to focus on the supposed need and the likely passenger demand for HS2.

The business case is based on a frequency of 18 trains an hour leaving and reaching London. HS2 has grudgingly agreed that a figure of perhaps 16 trains an hour in off-peak periods might be appropriate. The trains would be some 400 metres long, probably with 16 carriages; they would be rather similar to Eurostar trains, which are 20 cars long, and capable of seating 80 passengers per carriage. That is well over 1,000 passenger seats on each train. With 18 trains an hour over the day, that would mean in excess of 200,000 passenger seats going to and from London. That is a significant proportion of the total population of Birmingham; it is complete nonsense. In any case, 18 trains an hour is just not possible. At a meeting of the Select Committee on Transport in 2011, SNCF witnesses from France with some knowledge of high-speed TGVs were astonished at the 18 trains an hour figure, saying it was impossible, and that 12 trains an hour was the absolute maximum.

HS2 has been in a mess and a panic for some time about costs. It asked if it would be possible to terminate trains at Old Oak Common and avoid the horrendously expensive costs of tunnelling through to Euston. The idea would be to transfer passengers to Crossrail at Old Oak Common. That would be impractical because of the vast numbers involved. Up to 20,000 extra passengers on Crossrail every hour is not a serious proposition. All this is just not credible. If HS2 goes ahead, we will surely see expensive trains on a very expensive track rattling around the country with very few passengers on them.

I want to end on a positive note. There are some serious and much-needed alternatives to HS2, and I have written a paper setting out some of them. I submitted my paper, prepared with the advice of a range of friends in the railway industry, to the House of Lords Economic Affairs Committee for its inquiry into HS2. I also submitted it to the recent Great British transport competition, supported by the TaxPayers Alliance, and was pleased that one of my proposals was selected as one of the winning schemes.

Most significantly, there is the GB freight route, with which I am involved and to which the right hon. Member for South Northamptonshire referred. This would be a freight priority line from the channel tunnel to Glasgow, built to a large-loading gauge and almost entirely on railway land, capable of accommodating full-sized lorry trailers on the trains. It would take some millions of lorry journeys off our roads every year, with immense benefits. It would link all the majority economic regions of Britain to each other, and to the continent of Europe, and Asia beyond.

There are several serious rail schemes that should be adopted and, if HS2 does not go ahead, all the schemes paused and abandoned by Government in recent times could simply be readopted. Electrifying the whole rail network, with massive improvements to railways in the north in particular, where rail has been disgracefully neglected, could and should go ahead. These schemes could provide many thousands of jobs very quickly, with track work ready to go. This would be money well spent in every sense.

We should reflect on the sensible Eddington report, which recommended rail investment in and around our major cities and conurbations, where real passenger need is most concentrated.

Barry Sheerman Portrait Mr Sheerman
- Hansard - -

Does the hon. Gentleman not realise—I think he does—that those of us in the north of England just want reliable and reasonably speedy connections between the towns of the north, and would love this sort of investment, sooner rather than later?

Kelvin Hopkins Portrait Kelvin Hopkins
- Hansard - - - Excerpts

I agree with the hon. Gentleman; absolutely. Even within the northern region there are some dreadful train services. There are old charabancs on rail tracks that are a disgrace and should have been replaced, and the lines have not been electrified. They should have been.