Lords ChamberMy Lords, this has been a good debate and a master class in damning the Government with faint praise.
In the future our energy supply, transmission and storage—everything—will change. The future will be different from the past. The big six will no longer be the big six but, we hope, just six among the many. There will be on-grid and off-grid, feed-in and feed-out. The customer will be at the heart of managing their own usage or contribution, and there will be savings of energy and in the energy cost to customers. This is an energy revolution and smart meters are a vital part of that future.
However, as many have said across this House, before they went downhill, smart energy needs to be smart. That is the lament and sorrow of the Bill because things have not happened in the right way: not the smart meter, because the first one was not interoperable—I will be grateful when I do not have to say “interoperable” too often; not the data collection; not the rollout; not the selling; and not the installation. There were delays to completing the rollout; costs which might result from delays to the system; issues around the financial security of DCC and the financial status of its parent company, Capita. It was helpfully pointed out by the noble Lord, Lord Grantchester, that there has been a recent profit warning. There were concerns over whether appropriate data protection and privacy would be provided; connectivity concerns; issues around installation visits; concerns about doorstep selling; problems with the disconnection and disposal of old meters; and problems around inaccessible homes. Between them, Members across the House have raised all those issues.
On the hoped-for benefits, in the other place the Secretary of State, Greg Clark, said that a third of the savings come from potential reductions in the use of energy, just over 40% come from the suppliers’ costs saving—not having to read meters and so on—and that he expects those savings to be passed on to the customers in their bills. I am concerned that this was put as an expectation rather than an instruction. What will the Government do if this expectation is not met? I do not think we should leave this to expectation. We should be able to assure the customer and the client that these savings will be passed on, particularly since, as many across the House have pointed out, they are paying for the whole system.
Another key issue is the extent to which data will be private. We need absolute clarity over who owns that data and for how long, who may have access to it and how it will be protected—and not just clarity but assurances on how such information might be used and by whom, and how an individual can control, with absolute confidence, access to it. Will the proposed review of data usage be widely drawn and will it be published?
Is the Minister aware that some people with disabilities have concerns about this system? As we know, people with disabilities already pay more because of higher fuel consumption, as they are quite often at home all day. I talked to one of my noble friends only today who was very concerned she would be made to feel guilty if she could not use or calibrate a smart meter to use power at a different time of day because her needs were at critical times. Could the Minister speak to that? The Minister also raised the issue of smart energy awareness. Perhaps some of those campaigns could target those with disabilities and the most vulnerable.
Looking outside of that range of issues still needing attention, the Government want the Bill to have a narrow focus on three key things. The first is the extension of existing powers, which of course they want—and need to rectify all the things that have gone wrong. I shall not reiterate all those issues other than to say that 8.5 million first-generation meters have been installed and the Government are hoping to see the rollout of SMETS 2 meters, which do not have the interoperability problems of the older meters. In a private letter to energy companies, the Government said that systems designed to handle the newer meters were not ready and so they moved back the deadline for rolling them out from July to October. That means that more than 1 million extra first-generation smart meters will be fitted in homes, despite, as others have said, the devices being criticised for going dumb when customers switch. With the deadline moving from July to October, hundreds of thousands of people will receive the older devices. Therefore, SMETS 2 and the DCC are critical, and this sort of delay, along with all the issues to do with dealing with the installation of meters in your own home, with variable fitters and information, is damaging.
One of the challenges, as mentioned by my noble friend Lady Maddock, is that the reputation of smart meters is suffering because of all the problems that have arisen, which is damaging people’s willingness to adopt the new system. The extension of the Government’s powers and the delay to the rollout of SMETS 2 are concerning. It appears the Government are extending the period because of original targets being missed and they are worried there will be further issues for which an extension of powers will be required. Will the Minister confirm that this is the rationale for the extension of powers? Will he also confirm that their extension until 2023 is not connected to a potential overrun of the 2020 deadline for the rollout of the new meters—although a number of noble Lords have put a question mark on that deadline?
The second part of the Bill concerns the introduction of,
“a special administration regime for the national smart meter communication and data service provider … ‘DCC’ … in the event of its insolvency”.
I am unsure whether we have 100 SMETS 2 meters installed or 80—or 250, as was discussed in Committee in the other place. If the number is that small, there has to be a question about how robust and how well tested the function of the DCC is at that level. That does not seem an adequate supply of data to test that system. Coming to the DCC itself and the concerns over Capita’s financial status, what checks are the Government carrying out on Capita? In addition, does the role of the special administration regime exist as of the passage of this Bill or only when there has been trouble, or can it kick in in advance of any collapse in the system? What are the protections for the consumer in this event? If a special administration regime has to be put in place because there has been a failure on the part of DCC or Capita, what can official scrutineers and the public expect in the way of transparency and information about what has happened? Can the Minister give an assurance that we parliamentarians and the public at large will not be kept in the dark about why a special administration regime has been put in place? Obviously, a further concern has to be that the costs will be passed on to the consumer. Can the Minister explain why the consumer should be in any way liable for such a failure? Would any of the costs pertaining to such a failure fall to the consumer? Would it be the whole cost or part of it? In responding, it would be helpful if the Minister could set out the costs and savings to consumers and other players so that we can see who is benefiting and who is paying, and whether we think that is fair.
I turn to the provision of new powers for Ofgem to directly modify industry codes and documents to deliver a market-wide half-hourly settlement which uses smart metering data. Noble Lords across the House have welcomed this because it is the future. The idea is that incentives are placed on suppliers to meet their customers’ demands in each half hour of the day, and smart metering is intended to produce accurate half-hourly reports to get a better settlement and thus drive innovation and the efficient use of energy. However, suppliers can already choose to settle with consumers on a half-hourly basis via an elective half-hourly settlement, but Ofgem believes that it will have to make all suppliers do this to get the best results for customers. That, as I understand it, is a decision that Ofgem will take in the second half of 2019 and will be subject to a cost-benefit analysis, which I was pleased to hear the Minister say will be published.
However, the strange part is that it was introduced in the other place through a government amendment. That is of great concern. Why did the Government know only at the end of the process that such an analysis would be needed? One does kind of expect that, given that this is a complex new system, the Government would have known in advance that an analysis was necessary. Perhaps the Minister can explain its late appearance.
Lastly, I want to reflect on the contribution made by my noble friend Lord Teverson. I am glad he will not have to fix the electricity under the stairs any more. He recognises, as have other noble Lords across the House, how important this programme is. He said that the acronyms were suspicious. Perhaps the Minister can allay our suspicions, although I have to say that the acronyms are not as bad as they were when I was a Minister in DfID. My noble friend Lady Maddock pointed out that some of us think that parts of the Bill are rosy, but then referred to the rest of it as having rosacea, or words to that effect. She spoke for those in fuel poverty and expressed her concern about the role of Ofgem under the code of practice and the approach being taken towards vulnerable people. I would welcome it if the Minister could pay special attention to responding to those and other points raised in the debate.