Onshore Wind Turbines Debate

Full Debate: Read Full Debate

Onshore Wind Turbines

Andrew Bridgen Excerpts
Wednesday 13th October 2010

(14 years, 2 months ago)

Westminster Hall
Read Full debate Read Hansard Text

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Chris Heaton-Harris Portrait Chris Heaton-Harris
- Hansard - - - Excerpts

I agree with my hon. Friend, and I will talk about that point later. It is significant and important with regard to issues of noise and flicker, which I will come on to.

I believe that wind is a burden on the grid. It forces other forms of capacity to be shut down to accommodate wind production when the wind is blowing, and then instantaneously to come back on line when the wind stops. I would like to ask the Minister how much additional gas-fired power capacity—that is the only way that we can power up instantaneously—will be required to accommodate the current targets for wind capacity in the UK? What is the anticipated cost to the electricity markets in lost efficiency and stranded capacity associated with gas-fired plants operating as back-up for wind power? Will the Minister outline the efficiency losses, and the operational and economic impact on other forms of generation that have to modify their behaviour to accommodate the power that comes from wind?

Taking all those factors into account, will the Minister state how many grams of carbon dioxide, or just carbon in general, onshore wind will save per kilowatt hour? Is it not the case that, without massive hydro or other bulk storage, wind capacity must be matched on the UK grid almost megawatt for megawatt by fossil back-up operating at inefficient part load?

RenewableUK has publicly acknowledged that profits for wind farm operators are impressively large. That is largely a consequence of the operation of the indirect renewables obligation subsidy mechanism.

Andrew Bridgen Portrait Andrew Bridgen (North West Leicestershire) (Con)
- Hansard - -

Is not the crux of the problem the huge amounts of subsidy involved in operating wind farms, as my hon. Friend is explaining? I understand that it is in the region of £20,000 per mast to the landowner per annum and £100,000 possibly to the operator. That is what is driving the keenness to build wind farms, and we are in real danger of the sustainable tail wagging the energy dog.

Chris Heaton-Harris Portrait Chris Heaton-Harris
- Hansard - - - Excerpts

I agree. In 2006, the National Audit Office highlighted the fact that the subsidy for onshore wind was excessive and gave poor value as a carbon-saving measure. Those costs are borne by the electricity consumer, and the Office of Gas and Electricity Markets has questioned whether the growing level of that indirect and regressive taxation is acceptable.

The high profitability for onshore wind is skewing renewables investment across our country towards onshore wind and away from research and development for other technologies and other remedies such as energy saving and consumption reduction. It is also, as my hon. Friends have mentioned in relation to each of their constituencies, encouraging large numbers of speculative applications for wind farms.

--- Later in debate ---
Chris Heaton-Harris Portrait Chris Heaton-Harris
- Hansard - - - Excerpts

I would very much welcome the Minister committing to that. Indeed, I have asked him about whether there are secondments from the noise industry to DECC at the moment, and I believe that the reply I got was slightly incorrect. I will contact the Minister.

--- Later in debate ---
Charles Hendry Portrait Charles Hendry
- Hansard - - - Excerpts

Where a case goes to appeal, it will be decided only in relation to the wider planning guidance that the Government set out. If it is felt that the guidance has not been adhered to in making a determination, it is entirely proper that there be an appeals process. In the spirit of fairness, we all believe that it is right that if an application is turned down at one level, people should continue to have a right to appeal for a redetermination. It must be done within the spirit of the rules set down, and that is absolutely key to what we are saying.

In the debate, we have heard a call for the transfer of support from wind to other renewable sources. We do not see wind as the ultimate solution on its own. It has a part to play, but we supported the banding of the renewables obligation certificates, because that started to give more support to emerging technologies, which need more help to come to fruition. The UK should lead the world in marine technologies, and the steps that we are taking elsewhere will ensure that, certainly by the 2020s and beyond, this will be the natural place in the world for people to come to develop those technologies. In the meantime, we need continuing diversity, and that includes wind. We cannot rely entirely on one low-carbon technology. We expect other low-carbon technologies to come through, particularly nuclear technology—without subsidy—which we are making progress on, as well as clean coal and coal with carbon capture. We expect the widest range of renewables possible in the framework.

Onshore wind is one of the most cost-effective and developed of all renewable technologies, and has almost zero marginal cost, because once the facilities have been constructed, the cost of the energy—the wind—comes without charge.

Charles Hendry Portrait Charles Hendry
- Hansard - - - Excerpts

I hope my hon. Friend understands that many points have already been made in the debate and it is crucial that I have a chance to respond to those in the remaining few minutes.

The renewables obligation has been banded to incentivise investment in other technologies, but what is critical about the ROC is that if the wind does not blow strongly, there is not as much income, because the money received is directly related to the amount of electricity generated. It is based on payment per megawatt hour of power generated. Therefore, if a wind turbine is located where the wind does not blow much and where the turbine does not turn much, very little revenue is returned to the area. That was one of the most important aspects of taking such an approach. It is also linked to the wholesale price: if the price drops as a result of there being a huge amount of supply in the system but not a great deal of demand, the amount of money that goes back is reduced. That recognises the changes in demand and supply found more generally in the system.

We recognise, of course, that wind is intermittent. As my hon. Friend the Member for Daventry said, back-up is required, including from gas, coal or biomass. It could also be done through storage—pump storage and hydrogen or battery technologies are coming through at an impressive rate. That will start to move the technology on from working only when the wind blows to allowing electricity to be available when people need it.

However, there is another side to the argument. Sizewell B, one of our more recent nuclear power stations, has been out of operation for seven months. In that time, it did not produce a single unit of electricity, but our wind system produced 1.8 TWh of electricity, the equivalent of the annual consumption of 400,000 homes. We believe that security of supply comes from a mix of technologies. We cannot put all our eggs in one basket. Having a mix means that if there is a problem in one part, we have a better chance of keeping the lights on, and doing so affordably.

Turbines generally turn about 70% of the time. The load factor figures suggest that it is lower than that, but the turbines may be turning at a relatively low speed for 70% or 80% of the time; there are only a few hours when they are not generating. There was a period at the beginning of the year when they were contributing perhaps only 0.1% of our electricity consumption, but recent figures show that they have been producing 10%. The figures fluctuate, and they need to be seen as part of the totality of what is necessary.

In the time that remains, I shall touch on some of the other issues in the debate. On noise, my primary concern is that the issue is not being treated similarly in all parts of the country. The report that I have commissioned from Hayes McKenzie will consider how noise is to be interpreted to ensure uniformity. It does not seem right that it should be considered in one way in Northamptonshire and in another in East Yorkshire. I assure the House that in appointing Hayes McKenzie I considered who it had worked for to ensure that it can work for local authorities on one side of the equation and wind developers on the other. I want to be convinced—I have been convinced—that the company can provide genuinely independent advice.

My right hon. Friend the Member for Haltemprice and Howden (Mr Davis) spoke about the previous report. I understand that certain issues were removed before I became involved in this work, relating to things that were outside the initial scope of the report. However, I give an absolute assurance that the Hayes McKenzie report will be published in its entirety and that it will be subject to peer review, so that we can clear about what needs to be done. There is a further review on amplitude modulation by RenewableUK. That, too, will be subject to peer review. I hope that will help to complete the picture.

Other issues were raised this afternoon, and I hope to have the chance to write to my right hon. and hon. Friends to ensure that they have a complete response.