Rob Salter-Church: That is a good challenge. We gather regular information by engaging with Citizens Advice, which is a good source of information if people are raising concerns or complaints about their smart metering installation. As I mentioned before, we also gather information from the smart metering installation code of practice survey. We gather information from a wide range of sources. If we thought there was a systematic problem and suppliers were not being clear to customers about information consent, we would absolutely do something about it and use all the powers that we have to crack down on those suppliers and make sure that consumers are protected. I hope I can reassure you that we have both the practical arrangements in place to get the data and the will to do something if we see that there is a real problem.
Q
Angus Flett: I can reassure the Committee that DCC is fully operational and ready to scale. If we look at the facts, DCC was born in 2013. Our first release was due in December 2015 and was actually delivered in October 2016—the following year. The latest release, which was due in November, we delivered bang on track. There are subsequent releases to unlock functionality such as prepaid and so on.
We run regular “ready to scale” forums with our suppliers and customers. The forecasts that are coming through from my main customers indicate that I will be doing well over 200,000 installs a week next year, and that number is growing. In fact, one of my main customers issued a press release saying that it was the first to go live with the installation of SMETS 2. We are also putting in place incremental measures to ensure that, as we cut over from SMETS 1 to SMETS 2, we carry a buffer stock of communications hubs so that my customers can ramp down their old stock and ramp up the new stock. We are confident that we can deliver against the scaling requirements.