Renewables Obligation Closure Etc. (Amendment) Order 2016 Debate

Full Debate: Read Full Debate
Department: Wales Office

Renewables Obligation Closure Etc. (Amendment) Order 2016

Lord Wallace of Tankerness Excerpts
Wednesday 16th March 2016

(8 years, 8 months ago)

Lords Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Lord Bourne of Aberystwyth Portrait The Parliamentary Under-Secretary of State, Department of Energy and Climate Change and Wales Office (Lord Bourne of Aberystwyth) (Con)
- Hansard - - - Excerpts

My Lords, the draft instrument closes the renewables obligation 12 months early to solar PV generating stations at 5 megawatts and below from 1 April 2016. It would apply both to new generating stations and to existing stations that wish to add additional capacity up to the 5 megawatts threshold.

Solar PV is an important part of the low-carbon energy portfolio. It has seen very strong growth in recent years, due in no small part to support from the renewables obligation and the feed-in tariff schemes. Almost 40% of the UK’s solar PV capacity over 3 gigawatts was installed during 2015 alone. Hand in hand, the costs of installing solar PV have reduced dramatically. According to data from Bloomberg, the capital cost of a ground-mounted PV system fell by about 60% between 2010 and 2015.

In many ways, this progress is good news, making a valuable contribution to our renewable electricity generation, but the amount of deployment has also raised concerns about its impact on the levy control framework—the budget which caps the amount of support paid for through consumers’ energy bills. I am sure that noble Lords will agree that there is a need for government to act responsibly when there is a risk of exceeding such a budget. That is why we have introduced a number of measures to deal with the projected over-allocation of renewable energy subsidies. In these measures, we have aimed to strike the right balance between the interests of consumers and those of developers.

This time last year, under the coalition Government, we were considering a similar order relating to the early closure of the renewables obligation scheme to large solar farms—those over 5 megawatts. Solar farms at this large scale were deploying much faster than previously expected, and we were rightly concerned about the impact this speed of deployment could have on the levy control framework. At the time, it was decided not to extend the closure to projects at 5 megawatts or below because the evidence suggested that these smaller schemes posed less of a risk to the costs of the levy control framework.

Noble Lords will recall, however, that in the debate last year—under the coalition Government—it was made clear that the deployment of smaller-scale projects would be closely monitored. If deployment was shown to be growing more rapidly than could be afforded, measures would be considered to protect the integrity of the levy control framework. That monitoring revealed that, if we did not act, up to four times more new solar capacity would be eligible for support this year and next under the renewables obligation than we previously estimated—within a range of 2.4 to 3.8 gigawatts, compared to the 600 megawatts to 1 gigawatt that had been estimated. I am sure that noble Lords will agree that in such circumstances, the need for further action is essential.

In taking this action to complete the early closure of the renewables obligation to solar, we have aimed to strike the right balance between protecting bill payers and protecting developers who have made significant investments, while being conscious of the need to decarbonise our energy infrastructure. That is why the order makes provision for a number of grace periods, which mirror those offered last year as part of the large-scale closure. Stakeholders have welcomed this consistency. One respondent to our consultation said:

“Technologies must be treated equally as far as possible and the requirements outlined are in line with those proposed for early closure of the RO to solar above 5 megawatts”.

One of the grace periods was designed to protect developers who could show that a significant financial commitment had been made on or before the date on which the proposals were announced. This required evidence that a planning application had been made, among other things, as a proxy for the financial commitment.

Following the consultation, we are changing the criteria to clarify that we intended to protect projects that had made a valid planning application, in line with planning legislation across Great Britain. This is because we received evidence during the consultation from many planning authorities that some developers were submitting incomplete planning applications just to meet the cut-off for eligibility for the grace period.

Lord Wallace of Tankerness Portrait Lord Wallace of Tankerness (LD)
- Hansard - -

I am interested in what the noble Lord is saying. He seems to be saying that if there is clear evidence of a significant financial investment being made before a planning decision was made, developers will qualify for the grace period. Why is he not currently doing the same for onshore wind, where the cut-off seems to be far more arbitrary?

Lord Bourne of Aberystwyth Portrait Lord Bourne of Aberystwyth
- Hansard - - - Excerpts

The parallel here is with the schemes above 5 megawatts and the undertakings then given to look at this in the same way in the light of increased deployment, which has certainly happened. I appreciate the point—it is different, there is no doubting that—but this is a continuation of what happened with schemes above 5 megawatts. That is the reason for the treatment we are going for.

When we closed the renewables obligation early to large-scale solar farms last year, we saw a rush of projects accrediting to beat the closure date. More than 1.5 gigawatts of solar were accredited in March 2015 alone. That is equivalent to around 5,000 football pitches. This time round, we had evidence to suggest that costs of solar PV had fallen further and faster than previously anticipated. I have already mentioned the steep fall that there has been. We have therefore proposed excluding new solar projects at 5 megawatts and below from our grandfathering policy if they do not meet the significant financial commitment criteria. This has been necessary to avoid locking in possible overcompensation in the event of a similar rush of projects accrediting before 31 March 2016. This change in policy would mean that projects which are not grandfathered would not maintain their support level if a banding review determined a lower level of support. This proposal was necessary as a cost control measure. We confirmed this change in policy last December, and at the same time started to consult on the results of the banding review. We are currently considering the consultation responses; the consultation finished at the end of January. Subject to the outcome of that process, changes would be implemented through a separate amendment to the renewables obligation order 2015 later this year.

On the impact of the order, our analysis indicates that the early closure proposed in it will save between £60 million and £100 million per year from consumer bills: over the 20-year period of the obligation, that is £1.2 billion to £2 billion in real terms over the lifetime of the projects. Over 8 gigawatts of solar is already deployed and we estimate total solar deployment under the levy control framework subsidy regimes will reach 12.8 gigawatts by 2020, following this closure, taking account of what we are doing today and the action taken in the recent feed-in tariff review. Without this intervention, we estimate that it would be very close to 20 gigawatts, or some 8 gigawatts above what we projected. The electricity market reform delivery plan is our best estimate of what we need to hit the renewables 2020 target, which set out an intention to deploy between 10 and 12 gigawatts at the upper end. In fact, even with these changes, we are on track to exceed that range. This further underlines the need to take action now to prevent further solar deployment under this scheme.

Before I close, I should mention that we have taken the opportunity in this order to remove an inconsistency between the renewables obligation closure order 2014 and Article 91 of the renewables obligation order 2015. This had been drawn to our attention by stakeholders. This technical amendment makes it clear that an operator of an offshore wind station benefiting from a closure grace period can apply to Ofgem for registration of offshore wind turbines until 31 March 2018. I do not think that that is controversial.

This Government are committed to combating climate change, but in the most cost-effective way for bill payers. In tackling climate change at home, British families and businesses are better off inside the European Union. It provides a more stable and long-term framework to attract investment in UK clean energy projects, helping to keep bills down, create new jobs and boosting our energy security. Accordingly, the costs of solar are continuing to fall, and we expect solar to be delivered without subsidy over the coming years. However, since solar PV has been such a success in the United Kingdom, by summer 2015 the costs imposed on bill payers associated with support for renewable and low carbon electricity generation were forecast to reach £9.1 billion in 2020-21, significantly above the target of £7.6 billion. These costs, if they reached that level, would lead to increases in consumer bills. It is therefore only right that we have looked at ways to protect value for money and affordability under the levy control framework.

I hope that noble Lords will agree with me that on balance, the approach we have taken is the right one, closing a demand-led scheme and taking action on overcompensation while still allowing solar to deploy under the revised feed-in tariff scheme. This will ensure that solar PV is supported in a way that offers better value for money for consumers. I commend this draft instrument to the House.

Amendment to the Motion

--- Later in debate ---
I understand some of the concerns that have been expressed, but in relation to this measure I can say only that we do not need this subsidy. There is deployment without it, and we would be wrong to subsidise where it is not needed. We would be wrong, as a Government, not to take action on a subsidy where the evidence is that it is not needed.
Lord Wallace of Tankerness Portrait Lord Wallace of Tankerness
- Hansard - -

My noble friend Lady Featherstone mentioned investor confidence. My noble friend Lord Teverson and the noble Lord, Lord Grantchester, referred to the Energy and Climate Change Committee in the other place and its deep concerns about the cumulative effect of government policy on investor confidence, not just in solar or onshore wind but generally. Will the Minister please address the points that were very effectively made about investor confidence?

Lord Bourne of Aberystwyth Portrait Lord Bourne of Aberystwyth
- Hansard - - - Excerpts

My Lords, of course investor confidence is an issue. In the department we meet the industry on a frequent basis—I met representatives of the solar industry just this week. Some of the concerns that are being expressed tonight were not expressed to me on that occasion. Of course there is a healthy dialogue, but I do not recognise some of the wilder statements being made about the lack of investor confidence. Industry will always take a particular view, and there will be some in industry who will not want to see an end to subsidies—I understand that; why would they? However, as a Government, we have to see how money can be well spent.

It has been a good debate, but I urge noble Lords to reject the amendment and support the order, which is a necessary part of ensuring that we get value for money, do not overdeploy in this area and end subsidies that are not needed.