High Speed Rail (Preparation) Bill Debate

Full Debate: Read Full Debate
Department: Department for Transport

High Speed Rail (Preparation) Bill

Lord Stevenson of Balmacara Excerpts
Tuesday 19th November 2013

(11 years ago)

Lords Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Lord Stevenson of Balmacara Portrait Lord Stevenson of Balmacara (Lab)
- Hansard - -

My Lords, I declare an interest as a resident of Little Missenden, a small village in the centre of the Chilterns. I live in the village and have done for nearly 20 years. The proposed route currently goes close, but not that close, to the village, and it is tunnelled in the immediate environment of Little Missenden, but that does not stop me having concerns about the way in which the programme has been developed. I thank the noble Baroness, Lady Kramer, for her eloquent introduction of this paving Bill and I particularly thank the noble Lord, Lord Bradshaw, for his concern about the Chilterns, which I listened to with great interest. That is in fact what I will talk about in my brief address.

Much time has been spent in your Lordships’ House recently on the National Planning Policy Framework. In its section on conserving and enhancing the natural environment, it says:

“The planning system should contribute to and enhance the natural and local environment”;

and it gives some examples, the first of which is by,

“protecting and enhancing valued landscapes”.

Later it says:

“In preparing plans to meet development needs, the aim should be to minimise pollution and other adverse effects on the local and natural environment. Plans should allocate land with the least environmental or amenity value, where consistent with other policies in this Framework”.

It continues:

“Great weight should be given to conserving landscape and scenic beauty in National Parks, the Broads and Areas of Outstanding Natural Beauty, which have the highest status of protection in relation to landscape and scenic beauty ... Planning permission should be refused for major developments in these designated areas except in exceptional circumstances and where it can be demonstrated they are in the public interest ... planning permission should be refused for development resulting in the loss or deterioration of irreplaceable habitats, including ancient woodland and the loss of aged or veteran trees found outside ancient woodland, unless the need for, and benefits of, the development in that location clearly outweigh the loss … Planning permission should … identify and protect areas of tranquillity which have remained relatively undisturbed by noise and are prized for their recreational and amenity value for this reason”.

There is clearly a tension here between conservation and what may be claimed by those who support the proposed route for HS2 to be in the public interest. For example, the Woodland Trust has demonstrated that the Government’s preferred routes for both phases of the HS2 scheme will cause loss or damage to at least 67 irreplaceable ancient woods. When the Secretary of State—who was in his place a few minutes ago—announced the preferred route for phase 2 of HS2, he said:

“The scheme would avoid any national parks or areas of outstanding natural beauty”.

So, the Chilterns AONB is now the only AONB along the entire HS2 phase 1 or phase 2 routes that is adversely impacted by the proposed project. Actually, it will be destroyed as the present tunnel erupts into an ancient monument and an ancient wood bang in the middle of the AONB.

The draft environmental statement consultation published on 16 May accepts that a tunnel through the Chilterns AONB would perform better on environmental grounds when compared with the current HS2 Chilterns tunnel option. It accepted that it would also reduce operational noise impacts and, for certain locations, would result in reduced construction impact. In other words, it seems to meet many of the concerns expressed in the national planning framework. It is feasible in engineering terms and would fully protect the only unique area of outstanding natural beauty on the HS2 route; meet local concerns without damaging the overall objectives of the HS2 project; avoid major surface construction at 10 sites in the AONB and the loss of ancient woodland and the Grim’s Ditch ancient monument; and is supported by all the local councils and action groups within the AONB.

The designation of the protected landscape of the Chilterns AONB rests on the unique characteristics of its landscape. The design of the Government’s proposed scheme takes no account of the designated landscape of the Chilterns AONB or the protective provisions of Part IV of the Countryside and Rights of Way Act 2000. Conserve the Chilterns and Countryside has commissioned a study into the practicalities of extending the tunnel from the proposed current termination point to the boundary in Wendover. This study was published in October 2012 and HS2 Ltd was asked to comment on it. The conclusion it reached was that such a tunnel extension was a practical engineering solution, but it declined to pursue it because it is of the opinion that it will cost more than the published scheme.

However, there are other factors to be taken into account here—factors that have so far been ignored but which need to be debated. The analysis undertaken to date has shown that the published scheme affects 60 square kilometres of the Chilterns AONB; the tunnel extension through the Chilterns would affect six square kilometres. The published scheme would result in the loss of 13 historic sites; the tunnel extension would affect one. The published scheme removes 9.2 hectares of ancient woodland; the tunnel extension affects none. With the published scheme, approximately 250 hectares of agricultural land would be lost but under the tunnel extension only 20 hectares would be lost. From the figures that I have given, your Lordships can see that there are other factors to be taken into account. Analysis of these further indicates that the proposed scheme will incur environmental and other costs of the order of £500 million to £750 million, which is about twice the additional cost of building the tunnel extension.

Given the duty of the Government under Section 85 of the Countryside and Rights of Way Act 2000 to,

“have regard to the purpose of conserving and enhancing the natural beauty of the area of outstanding natural beauty”,

the scale of any cost differential between the published scheme and the proposed tunnel extension has to be balanced against the incalculable loss of an AONB—the only one on the line, and the one nearest to London.

In his speech last Tuesday, which has already been referred to, the noble Lord, Lord Heseltine, recalled his long interest in regeneration. He gave the example of Canary Wharf, where he recalled that he had appealed over the heads of his senior Cabinet colleagues—perhaps the noble Lord, Lord Freeman, was one of those—the Permanent Secretary of his department and all the leaders of the London boroughs to the Prime Minister who, he said, “backed me”. Perhaps he should have added “on this occasion”. He also recalled that another Prime Minister backed him against the Department of Transport when he,

“argued for HS1 and the regeneration of Stratford against British Rail’s preference for the Channel Tunnel to hit the buffers at Waterloo and exclude the rest of the UK”.

The noble Lord’s example of the late change of route imposed on HS1 is instructive. In truth, there ought to have been a lot to learn from that episode. HS2 appears to have ignored many of the principles established by HS1. The lower design speed of 300 kilometres per hour allows the line to be twinned with the M2 and M20 motorways through Kent. It used existing major transport corridors. HS1 crosses the Kent AONB at its narrowest point. The published route for HS2 crosses the Chilterns at its widest point. As the noble Lord, Lord Heseltine, pointed out, bringing the main terminus out of London to Stratford brought much needed regeneration to the East End and paved the way for the Olympics. What would be the analogy for HS2, and why is the noble Lord not suggesting that at this time?

While I do not agree with everything that the noble Lord says in his speech, he does echo the recent Armitt report's call for us to do our infrastructure planning differently in future, although appealing over the heads of one's colleagues is probably not what Armitt had in mind. The reality is that the Government will not get their hybrid Bill for phase 1 of HS2 through in this Parliament. Given that the public interest would be better served if the proposals could be evaluated in the context of a fully developed infrastructure plan and a national planning framework of the type outlined in the recent report by Sir John Armitt, why not pause—which seems to be the vogue—the process now? There would then be time to engage in a proper cross-party debate and take a fresh look at HS2 to help the Government build in greater connectivity, sustainability and flexibility, and also help meet local concerns without damaging the overall national objectives of the HS2 project.

--- Later in debate ---
Baroness Kramer Portrait Baroness Kramer
- Hansard - - - Excerpts

My Lords, what a tremendous debate. Every time this issue comes before the House I learn more, which adds very much to the pleasure. I, too, was appreciative that the Secretary of State came to listen to the early speeches; he then had to leave to vote, but I know that he will read the rest of this debate. I know that that information flow to him is very much appreciated on his part.

Obviously, the overwhelming majority of noble Lords who spoke today spoke so strongly and positively in favour of HS2 and the high-speed rail network that once again I feel almost that the comments that I can make are somewhat redundant; they have been almost better covered by other noble Lords who have spoken. I will begin by trying to pick up on the questions from noble Lords who were perhaps more sceptical, and in particular that issue of cost that the noble Lord, Lord Davies of Oldham, mentioned, which was also mentioned by other noble Lords—by the noble Lord, Lord Howard of Rising, in particular, and in a slightly different way by the noble Lord, Lord Adonis.

The cost of the project—the budget—has been set at £42.6 billion. The noble Lord, Lord Howard of Rising, mentioned the figure of £73 billion, which was floated in the Financial Times and some other parts of the press. That is a mischievous number, because of the way in which it is constructed; I was quite sad to see it in a respectable newspaper. It included things like VAT, which obviously comes back to the Treasury and is therefore not a cost to the taxpayer. It also included inflation, although we look at infrastructure projects using current numbers rather than inflated numbers because we do not look at the benefits in inflated numbers. A mischief-making number has, unfortunately, been introduced into this conversation.

I shall say more about cost, because it is important—and what I have to say about it will also address some of the other issues that have been raised. The work that has been done in preparation for High Speed 2, to the point where it is now ready for phase 1 to appear in a hybrid Bill, is far more intense than that for any previous hybrid Bill. I think that that degree of preparation is a good thing, and I am cleared to say that the hybrid Bill will be introduced in the Commons on Monday. That degree of detailed examination and preparation gives us far greater confidence in the actual numbers, particularly for phase 1.

As the noble Lord, Lord Davies, will know—he has read the strategic case—High Speed 2 now estimates that, without any contingency, it could bring in phase 1 at £15.6 billion. The Secretary of State has said that we need to have a little contingency, but he wants to see this come in at £17.16 billion or less. That is the pressure being put on Sir David Higgins, and he feels that it is pressure that he can accept. That is a much crisper number than the more overarching number, including contingency, that we have generally been using. I ask that, as people look at the strategic case, they understand that we are talking about the overarching budget, but that underneath that there is huge pressure to ensure that the cost is pushed down, and we can do that with more and more confidence because of the level of detail that we now have. I hope that that also explains to the noble Lord, Lord Adonis, why there is a generous contingency in all this. The contingency does not reflect the fact that there is very detailed work going on to push the cost down.

That consideration also speaks somewhat to the governance point raised by the noble Lord, Lord Rodgers of Quarry Bank. Sir David Higgins, when he comes in, will make governance and driving down cost two of his highest priorities. The governance programme, which sounds incredibly complex as it is read out in a paragraph, actually reflects a number of bodies that have come together to increase the downward pressure on costs. That is part of the reason why there have been so many parties so absolutely focused on ensuring that the costs of the project have been reduced to the greatest extent possible.

In the same context, Sir David Higgins has said that he will look at delivering HS2 faster. There is an underlying question here, which I picked up from a number of people today—for example, from the noble Lord, Lord Smith of Leigh—along the lines of, “Why don’t we start both phases pretty much at the same time?” The answer is that we have the detailed work to be able to go ahead with the hybrid Bill for phase 1, and to hold that up in order to bring phase 2 to the same degree of preparation would hold back the whole project. We are in a position to move much faster on phase 1. I have heard many people in the House today talking about the importance of going as fast as possible; they compared us unfavourably with France, and I can understand why. We are doing this in phases so that we can get into the ground at the earliest possible date.

Benefits will flow from phase 1 alone. It is true that the maximum benefits will come when phase 2 is completed, but from phase 1 alone there is already an advantage, both in capacity going from London through to Birmingham—on the most congested set of routes that we could possibly have—and also in terms of starting the time reduction, which, as others have said, adds to the connectivity and the potential for development in the north and the Midlands.

The noble Lord, Lord Cormack, referred to the Bill as a blank cheque and asked why it does not have a monetary figure in it. The Bill gives permission for preparatory expenditure and contains a very vigorous reporting process under which the Government must report back annually and record any deviation from budget, and the consequences of that. The wording of the Bill has been strengthened somewhat in the other place, which has put in place a very intense scrutiny process around the budget.

One of the reasons why there is no monetary figure is because this is not just the paving Bill for HS2 but allows us to look at extensions. The noble Lord, Lord Dubs, talked about the importance of going beyond HS2 and looking at Scotland. I was up in Glasgow and Edinburgh just over a week ago, announcing formally the initiation of a study which will look at bringing the benefits of high speed to Scotland. Automatic benefits come from bringing High Speed 2 as far as Leeds and Manchester. In fact, Scotland benefits even from the run to Birmingham. However, taking it beyond that, the study will look at how to maximise high speed on existing rail lines and at potentially building what some people have dubbed “High Speed 3”. This paving Bill creates the context for what in the end will be a high-speed rail network. The word “network” matters in the context of some of the questions about economic growth. Dedicated high-speed trains can run only on high-speed lines. However, in addition, these lines can be used by the classic trains which currently operate on our long-distance services. They can travel part of their journey on a high-speed line and then deviate off on to the west coast main line and various other lines, creating a much more interconnected network.

The noble Lords, Lord Stevenson of Balmacara and Lord Cormack, and, to some extent, the noble Lord, Lord Rodgers, raised concerns about the Chilterns and its highly valued landscape. We all value that landscape; I do not think there is any question about that. However, I think that we have also always understood that there are circumstances in which we have to weigh the significance of infrastructure projects against that value. We must mitigate any effects to the extent that we can. I listed earlier many of the mitigations. Looking much more narrowly at the Chilterns, I say to the noble Lord, Lord Stevenson, that, between Chalfont St Peter and Hyde Heath, which is a distance of 8.3 miles, of which 5.8 miles lies in the area of outstanding natural beauty, the route will be in a tunnel. To minimise the visual impact in the AONB, the following mitigation measures will also be taken: 3.5 miles in cuttings; 1.5 miles in “green tunnel”; 0.6 miles on viaducts; and 1.4 miles with embankments. This means that fewer than two miles of the 13 miles of the route through the Chilterns area of outstanding natural beauty will be at surface level or above. The noble Lord, Lord Stevenson, has asked why we cannot extend the tunnel. Unfortunately, that would require the construction of ventilation shafts and an emergency access station at Little Missenden. Weighing that damaging environmental impact against the current mitigations has led us to the conclusion that we have used tunnelling to the best effect.

Lord Stevenson of Balmacara Portrait Lord Stevenson of Balmacara
- Hansard - -

I am very sorry to interrupt the noble Baroness, and it is a very trivial point, but it would have helped if we had been able to have the meeting that I requested over a month ago. It has not yet happened and if it had, we could have explained this. This canard about having to open up an opening near Little Missenden is not what is proposed. The alternative, which I sketched out for her and which I am happy to present to her in more detail, provides for an opening, required under European law, to be within the 22 miles covered by the AONB. It is near Wendover—in fact, at Wendover Dean—it is agreed by residents, agreed by all the authorities around and does not affect the central part of the Chilterns. This point was raised by her predecessor in a debate more than a year ago, and I tried to correct it then. I am clearly not effective at doing that, so can we please meet?

Baroness Kramer Portrait Baroness Kramer
- Hansard - - - Excerpts

As we agreed earlier, I am looking forward to that meeting and I apologise. Because I am new to the department, it has basically been triage. I regret that we did not have the chance to have that meeting before this debate, but we will have it. As the noble Lord, Lord Stevenson, recognises, the course of the hybrid Bill will address many of these issues.

The noble Lord, Lord Cormack, was very concerned that HS2 is a London-centric project rather than one which will spread economic opportunity out across the country. I could make the case in the other direction— I thought that I had in my opening speech, as had the noble Lord, Lord Adonis, and others, in the course of their speeches. I pray in aid the noble Lord, Lord Smith of Leigh, who from his position in Greater Manchester has been able to represent to this House today the great potential that Manchester and the other great cities of the north and the Midlands have seen in this project.

They are using this opportunity in a very positive way, which perhaps is relatively new as a British approach to infrastructure. So often, we have built an infrastructure project in a silo and left it to see if anything good generates around it. In this case, the noble Lord, Lord Smith, and others are working within the various local authorities and within the various key cities. My noble friend Lord Deighton, too, is working with his task force in order to try to reinforce and support the process. This is a very different approach that will ensure that we garner the economic benefits.

A number of noble Lords, including the noble Lord, Lord Rooker, and the noble Lord, Lord Davies of Oldham, reiterated the idea of the noble Lord, Lord Heseltine, of development corporations. It is certainly true that the Mayor of London would be able to initiate them—that is already within his competencies. However, the Government are waiting to see how local communities in the areas that will be impacted by HS2 will wish to take these issues forward. It is within the concept of devolution that Whitehall should not always know best how each individual area should approach these questions, but I suspect that in many of the schemes and developments that develop, we will look to capture development gain in various ways. Indeed, the Government have already said that they expect all the stations to be built, essentially, with private money, which in and of itself is a development-gain process. So I fully appreciate those comments and I know that they will be studied closely as we go forward.

The noble Lord, Lord Howard of Rising, raised an issue that has been in some of the literature that has been coming through people’s doors and which I would like to take on. He argues that we are not at capacity, citing an example quoted by one of the campaigning organisations, that trains are only 52% full in the evening peak. I think he is referring to a Virgin long-distance train. Certainly, regional and commuter trains are incredibly heavily used. To remove that Virgin train from the train paths in order to allow expansion of regional and commuter traffic would be a drastic option, widely opposed by passengers. There is sometimes no easy trade-off between the issue of train paths and usage at particular times. I also point out that the evening peak is a very well spread peak. During the morning peak we are pretty close to anyone’s definition of being out of capacity as it is, never mind in the circumstances that we will face as we get to the 2020s.

Perhaps I may move on to thank those who spoke so effectively and with much knowledge in favour of this high-speed rail network project. The noble Lord, Lord Adonis, called on the spirit of the Victorian pioneers and the spirit of cross-party working. Both have to inform the way in which we move forward. The noble Lord, Lord Bradshaw, talked from his experience of actually running the four lines that go out of London. That is always an invaluable and incredibly practical touchstone as we move forward in these debates.

My noble friend Lord Freeman brought to us the experience of being the Transport Minister for HS1. That project gave us the confidence to move ahead with HS2, and the lessons that he is able to bring to this debate are therefore crucial. The noble Lord, Lord Berkeley, again reminded us of the freight conundrum that we face. In passing, he also reminded us that it is not just the Chilterns that have an issue but the area around Camden, Euston station and the HS1-HS2 link. We must appreciate and do everything we can to achieve the necessary mitigations. In this case, there is close working now between Camden Council and Network Rail, although many issues have yet to be resolved and answered.

The noble Lord, Lord Faulkner, provided a constant reminder of the lack of alternatives to HS2. The point was put more clearly by the noble Lord, Lord Snape, when he said: if not HS2, what? One alternative is likely to be an exceedingly intrusive motorway. I am afraid that there would be not just one six-lane motorway if we do not build HS2 but probably two. The impact of that on the environment, communities and areas of natural beauty would be something that this House would, frankly, not relish.

I cannot remember whether it was my noble friend Lord Cormack or my noble friend Lord Howard of Rising who talked about aviation as an alternative. Again, the noble Lord, Lord Smith of Leigh, hit the nail on the head; the discussion around aviation capacity is primarily around international capacity rather than around attempts to build up a domestic aviation network of much greater intensity, but I will obviously bow to the Davies commission as it considers capacity issues in the south-east.

I should say thank you to the noble Lord, Lord Lea of Crondall, because on this occasion and previously he made a point that was picked up by others about the cluster potential. That was echoed by the noble Lord, Lord Smith, from the perspective that he and Manchester are looking at development. My noble friend Lord Teverson shared with us reports from Kent of the change from a negative to a positive attitude because of the experience of the benefits of regeneration as a result of HS1.

I am sure that in this whole process there are questions that I have failed to answer. I am reminded that I am coming to my boundary of 20 minutes. I feel that I have had the opportunity to listen to an exciting debate, and if I have not responded to questions we will do so afterwards. Perhaps I may conclude by saying this: let us protect the Victorian spirit that built our railroads, but let us look for an infrastructure that is not Victorian but modern and 21st-century so that we can build the economy of the future. I thank this House and I formally ask that the Bill be now read a second time.