(6 years, 5 months ago)
Westminster HallWestminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.
Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.
This information is provided by Parallel Parliament and does not comprise part of the offical record
I beg to move,
That this House has considered rail services in Hassocks.
I welcome the opportunity to raise the subject of the rail services provided for villagers in Hassocks in my constituency, and for others who use the station there, which is on the Brighton main line and which offers Southern, Thameslink and Gatwick Express services. Hon. Members may wonder why I am talking about rail services to a village. Although it has a population of only 7,700 people—making it the largest settlement in my constituency—Hassocks is nevertheless the 10th busiest rail station in west Sussex and is used by many people who do not live in Hassocks itself. It is a commuter village.
Many people move to Hassocks specifically because of the rail links that it provides to London and other places. In fact, 1.3 million passengers a year use Hassocks station. Therefore, my first and key point—I know that my hon. Friend the Minister has taken it on board, because he very generously met me to discuss this issue before the new timetable was introduced last month—is that this is not a small issue. A large number of people use the rail service from Hassocks in my constituency, and the Minister knows that they are very angry indeed. They have put up with two years of disruption because of the problems with the Southern service and the London Bridge upgrade. They fully accept that the London Bridge upgrade will ultimately be of benefit to passengers, but they are certainly not seeing that at the moment. Just as it looked as though we might be moving towards a steadier state for rail services in West Sussex, which over the past two years have been absolutely dismal, we have serious disruption again.
This all started with the introduction of the new timetable last month. I should say straightaway that I fully appreciate that the new timetable provides more peak trains to Victoria from Hassocks and the same number to and from London Bridge—theoretically; I will come to the actuality shortly. Theoretically there are more such services, but—here is the “but”—there are no longer any direct services to Clapham Junction, the busiest rail station in Europe, from Hassocks. Despite the size of the village and the numbers of people commuting from there, the direct services to Clapham Junction have simply been withdrawn, and I am talking not about the disrupted timetable, but about the new timetable, which was meant to offer an improved service to everyone.
Four peak-time morning trains to Clapham Junction have been removed, and Govia Thameslink Railway admits that three of those journeys will now be slower by up to 10 minutes because of the need for my constituents to change services. Six peak-time return trains from Clapham Junction to Hassocks have been removed, and GTR admits that four of the journeys will be slower by up to 10 minutes. GTR has told me that it appreciates that
“passengers will need to change trains,”
but
“the journey time is only increasing by an average of 7 minutes.”
Commuters dispute that: they say that changes at Gatwick or East Croydon are rarely quick or easy, because of overcrowding. I know that GTR is giving figures based on a four-minute change time at Gatwick. I defy the Minister, GTR executives or anyone else reliably to be able to change at Gatwick at peak time, even if the trains were operating properly, based on only a four-minute window.
I am most grateful to my right hon. Friend for the work that he is doing. Many of us in West Sussex are working together on this; it is a huge problem across the county. On his particular point about a changeover time of four minutes and with crowded platforms and mass disruption, commuters in my constituency are very concerned about the safety aspect. I am sure that that is a concern for his commuters as well.
I am grateful for my hon. Friend’s intervention. We have indeed been working together in West Sussex and we have been working closely with our right hon. Friend the Member for Mid Sussex (Sir Nicholas Soames), who is also very concerned about the disruption to services on the line. We are all concerned about the unfeasible interchange times and the safety implications, the implications for disabled passengers and so on. It is no good producing figures that show a theoretical benefit or not much of a change or not much of a problem for commuters, because of course it is actually very disruptive for people to have to change when they had a direct service before. These are busy working people. They often cannot get a seat once when they have changed. Their working patterns are disrupted, and they are just very irritated by the claim that somehow the service is nearly as good as it was before. It really is not.
There is a mismatch between demand and train routes. Gatwick Express trains, which stop only at Victoria, are relatively empty, whereas Thameslink trains have been severely overcrowded. I have raised before with the Minister whether it makes sense for Gatwick Express trains not to stop at the busiest station in Europe, Clapham Junction. If they did, that would offer more choice to people flying to and from Gatwick. The demand that those trains run direct from Gatwick to Victoria is problematic anyway, but it is certainly disadvantaging my constituents at the moment.
The Minister will tell me that only 9% of journeys in relation to Hassocks are to, from or through Clapham Junction. It sounds like very few when we hear that only 9% of my commuting constituents are affected, but actually it is 9% of a large number. It is 9.45%, to be precise, of the nearly 595,000 journeys that are being made to London. That means that more than 56,000 single journeys a year from Hassocks to Clapham Junction, in either direction, have now been withdrawn, in terms of the direct service, so that is not a small impact. It is impacting on the village, and people are very upset about it. Hassocks is a growing village—the number of houses will increase by one third in Hassocks alone, never mind the surrounding area—so to pick on one of the biggest stations in West Sussex and withdraw entirely the direct service to Clapham Junction simply does not make sense. I would therefore be very grateful if I could repeat to the Minister the request that I have made to him, to my right hon. Friend the Secretary of State, to GTR and to Network Rail, in so far as it is a matter for that organisation: will they please reconsider the new timetable, which has withdrawn what was an essential service for a large number of my constituents?
All this would be one thing, and I might not even have raised it in this Chamber, if it were not for the fact that these are theoretical new services anyway, because the disruption that has resulted from the new timetable has worsened the service not just for the commuters who have seen their service withdrawn, but for hundreds—no, thousands—of others. Frankly, the service since the introduction of the new timetable has been completely intolerable. I said at the beginning of the debate that my constituents were angry about it—they really are angry. This disruption is happening on a daily basis. It is deeply ironic that before the new timetable was introduced, GTR told me:
“We hope that with the introduction of this timetable, we will be in a position to provide…much more reliable services for all passengers travelling on our network.”
That would produce a very hollow laugh indeed from my constituents. The Minister knows that there has been widespread withdrawal, cancellation and delay of services.
The important thing for the Minister to note is that the situation is not getting better; in fact, it is just as bad as it was when the new timetable was first introduced. In the week before the timetable change, to 19 May, there were 18 train cancellations. That was a “normal” service. “Normal” service in West Sussex appeared to mean that my commuters had to accept that level of cancellations. Can people imagine an airline being run on the same basis? But never mind; there were “just” 18 cancellations in that week. In the first week of the new timetable, 245 trains were cancelled, and I am talking about trains to and from Hassocks. In the second week, there were 267 cancellations, in the third week 312 and in the fourth week 290. We are now in the fifth week and still nearly 300 trains a week are being cancelled. Might we have expected that after one month of the new interim timetable, which is resulting in services being withdrawn altogether, there might be some improvement? I am afraid not.
On Monday morning I received an email from a despairing constituent, Mr James Read, who lives in Hurstpierpoint. He said:
“I feel I must write to express my dismay at the current situation which appears to somehow deteriorate further everyday. This morning for example, I have never seen so many people waiting for a London train on the platforms at Hassocks. This morning, the 0623 was virtually full before it reached Hassocks. Then there were additional stops at Hayward’s Heath and Three Bridges to compound matters. It is totally unacceptable for people to be standing on a train service at 0630!”
I agree with that. I have a simple question for the Minister: when will this shambles come to an end? We are now four weeks on and it continues to be appalling.
I have here a timetable for rail services from Brighton and Hassocks in 1905, well over a century ago. The fastest of three direct trains from Hassocks to London Bridge took just one hour and 17 minutes. Those were steam trains. Theoretically, we now have direct services from Hassocks to London Bridge that are 23 minutes faster, but the reality is that we have a completely unreliable service. My constituents would be grateful to be transported back to the days of 1905, when they had three reliable steam trains that took them to London every single morning, compared to the chaotic, shambolic, disrupted, withdrawn and cancelled services that they are facing now.
What will be done about this? There is the issue of redress. I am grateful to GTR for at last recognising that tickets that are valid on one of the services should be passported to the others. I specifically asked for that and am grateful that it has been introduced. If a passenger has a ticket for a Southern service that is cancelled, they should be allowed to use it on a Thameslink or Gatwick Express service, or whichever service is available.
Then there is the issue of compensation. Of course, we must compensate passengers, but the compensation system is simply not good enough. It is not direct enough, immediate enough or sharp enough. It is too complicated for constituents to use. It just increases their irritation even more. We need a modern, sharper form of compensation system that is better than delay repay, so that the rail operating companies feel real pain when they are providing a shambolic and shoddy service like this, and passengers are compensated on a much more immediate basis. We need that not just because it would be fair to customers, but because it would introduce greater accountability.
Who will be accountable for this shambles? We have seen the resignation of Charles Horton, the chief executive of GTR, but what about Network Rail’s responsibility for this matter? It has admitted that it has some responsibility for the problems with Thameslink services, because of its failure to deliver in the north, which meant that it did not have enough staff to manage the new timetable. GTR says that one of the reasons it was in such trouble is that it was not given enough time to introduce the new timetable. The blame game is being played a lot. Who is being held accountable at Network Rail for this shambles? Yes, other projects may have been delivered on time and London Bridge might be wonderful, but that is not the point. My constituents want to know that people are being held accountable for these problems, so that they will not happen again.
Those were unforced errors, frankly. This is not the same situation as we are seeing in the north with union disruption. It is not the same as the situation over the last two years with the disruption to Southern services, which, we all came to realise, were largely driven by the unions manipulating problems that already existed with the lack of track because of the London Bridge upgrade and the shortage of drivers. There were other responsibilities, but the unions were driving it particularly. That is not the case with these Thameslink services now. We cannot lay the blame at the door of the unions for this. The blame has to be laid with the managers, whether in Network Rail, GTR or the Department for Transport, who presided over this shambles.
Why was there not an early warning system or risk register? Why were red lights not flashing, because this was a major change and could result in problems? We were still being told right up to the introduction of the new timetable that it might have minor teething problems, but it would be all right on the night. I am afraid it has not been all right on the night. We have to learn the lessons. I know that there will be an inquiry into that.
I am being placed—as my hon. Friends are—in a position where we are constantly having to apologise for the performance of the rail industry in our constituencies. It is difficult to explain to our constituents why more drastic action has not been taken to deal with this franchise.
My right hon. Friend is absolutely right. He is making a speech of great passion and he is spot on with every point. As he knows, we are facing the same issue in Balcombe. I have discussed it with the Minister before. Balcombe is a small village with a huge number of commuters who come into it. They pay a fortune every year in order to get to and from London. The least they can expect is to be able to do so reliably.
I like my right hon. Friend’s tone. Does he agree that an inquiry is one thing, but we simply need to know when these drivers will be trained and when the timetable will be working? Those are two simple questions, to which we need to have the answers as soon as they can be provided.
I agree with my hon. Friend. He has made the point directly, and I am sure the Minister will have heard it.
We will have to look at the size of this franchise again. It is too big. It was meant to deliver benefits in economies of scale, but it has only given us problems from the moment that it was introduced. We also need to look at the franchise holder. I appreciate that that is a legal process, but my constituents cannot understand why GTR is still running this franchise. There are longer term questions about the level of investment necessary in these lines. Hon. Members representing West Sussex constituencies will be very supportive of an increased level of investment, but that does not deal with the short-term issues.
In conclusion, my constituents in Hassocks are paying in excess of £5,000 a year for their season tickets. They rely on these rail services. I would, therefore, be grateful if the Minister would, first, look again at the question of whether direct services to Clapham Junction from Hassocks can be restored and, secondly, if he can tell us when normal, reliable services are likely to be restored.
I am grateful to the Minister for his attention to these problems, and I know how hard he has been working on them. His door has been open to us, and he has been receptive to the points we have been making. I certainly attach no blame to him or his colleagues. He has been badly let down indeed. I am sorry to address him in such tones, but it is important that I do so, because it is important for him to understand just how angry our constituents are now about this perpetually bad service and how despairing they are that there seems to be no end to it. They just want a normal, reliable rail service. In the 21st century, is that really too much to ask?
(8 years ago)
Westminster HallWestminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.
Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.
This information is provided by Parallel Parliament and does not comprise part of the offical record
It is a pleasure to serve under your chairmanship, Mr Gray. I congratulate my right hon. Friend the Member for Mid Sussex (Sir Nicholas Soames) on securing the debate on behalf of West Sussex Members, who are concerned about school funding in our county.
I will not repeat the case so ably made by my right hon. Friend and by my hon. Friend the Member for Horsham (Jeremy Quin) for redress to the unfair funding for the county over the mid to long term, because it has been perfectly well set out. I have also set it out before, in a debate in this Chamber last November, and I will spare my colleagues from hearing precisely the same remarks again. Another reason I am not going to set it out is because the Government accept that there is unfair funding in West Sussex. In response to the petition that has been organised by schools in West Sussex, the Government said:
“We recognise West Sussex is a relatively low-funded local authority.”
That is objectively the case—it is the third worst funded authority and is pretty much on the bottom as far as shire counties are concerned.
The Government have recognised the need to do something about that, so we do not just have warm words from them; we have a commitment to introduce the national funding formula. It is important that that is recognised and welcomed, because it is a brave step. Future funding should not be allocated to schools on a rather arbitrary and unfair basis but should be based on a proper assessment of need and with a view to ensuring greater fairness. That commitment was in the Conservative manifesto, the policy was announced by the then Chancellor of the Exchequer and it has been reiterated by the current Education Secretary. I understand that the introduction of a national funding formula has cross-party agreement; perhaps we will have confirmation of that later.
We are not arguing about the need to move to a fairer system in the mid to long term, or whether that will happen. I should just say that I think it is important that those who are pressing for fairer funding in West Sussex acknowledge the Government’s position on this and the commitment to introduce a national funding formula. It does not help when our county council issues statements on the matter and does not recognise that the national funding formula has been pledged, or when headteachers refuse to acknowledge it. I urge those whom I am supporting to take a little more care in ensuring that the way in which they present their case is balanced and is likely to be well received by those who have made a commitment to move in the right direction.
We are discussing the interim situation before the national funding formula is introduced, and the recognition that that formula has been delayed by one year, to 2018-19 rather than the year before as was originally pledged. On the expectation of fairer funding, it will be hard to introduce a fairer formula and not see some improvement for West Sussex, which is funded on the most palpably unfair basis at the moment, and for the situation to improve—but we should recognise that that improvement might be incremental.
In the meantime, schools in West Sussex face a particular difficulty. The Government have protected school spending overall, in the same way they have protected other key budgets, and that should be recognised. In a difficult fiscal framework, when there is a need to save money and when the country still spends more than it earns, the schools budget—a massive budget in the Government’s overall programme—has been protected. Nevertheless, the way in which that has been achieved means there has been flat cash for schools in West Sussex at a time when their costs have increased and costs have been loaded on to them. That was ably set out by my right hon. and hon. Friends.
It might help the Minister if I give a practical example, because I want to persuade her that the impact on these schools is real. In my constituency, we have a very good school, Steyning grammar school, which is in fact a comprehensive, not a grammar school. The excellent headteacher, who is presiding over an increase in standards year on year, has supplied me with figures, which I am happy to send to the Minister. The school has seen a real-terms cut in funding of around 10% since 2010 as a consequence of the increased costs it is having to meet and reductions in certain grants. As a consequence, the percentage of the school’s budget that is accounted for by staff costs is increasing from around 80%, where it should be, to 84%. Teaching full-time equivalents have fallen from 132 in 2010 to 118 in 2016-17.
In budgetary terms, this meant that in 2015 the school’s budget was just at break-even. In this financial year, 2016-17, the school has set a deficit budget of £600,000, which it will cover from reserves, but for 2017 it forecasts a deficit growing to £850,000 a year, which it will not have the reserves to cover. That will require the school to take action and to reduce its staff levels, which are at the national average in terms of ratios. Unlike schools in other parts of the country that are much better funded and have more generous staff-to-pupil ratios, that school does not have room to make those reductions without there being an impact on the delivery of education and, it fears, on standards.
I strongly urge the Minister to look at the funding and the impact on school budgets in counties such as West Sussex that are facing real-terms funding reductions because of these cost pressures. She must look at the impact on those schools’ budgets on the ground, to recognise that they are not engaged in a game of playing bleeding stumps but face particular difficulty.
Constituents of mine attend Steyning grammar school, which is an excellent school. With a deficit of £850,000 and staffing at 84%, 85% or 86% of the total budget, if there are forced changes in staff numbers, it would be particularly galling to go through the cost and the pain of reducing staff numbers by whatever means, only to be required as a result of fair funding coming through to then source and recruit new teachers to resurrect those posts and start delivering again for pupils.
I agree with my hon. Friend. He is much better at maths than I am and is able to point such things out. That is what underlines the whole case for transitional funding. I do not necessarily argue that there is a link between performance in the public sector and funding. We should never assume there is an automatic link between the two, such that any reduction in funding is unmanageable or will have an automatic effect on performance. It is incumbent on any public sector institution to run efficiently and to make savings, but by any objective measure the funding of schools in West Sussex is already among the lowest in the country, so there is no fat to cut without there being an impact.
If we still have to make national savings and the schools budget is to be included within that, that should be achieved on a fair basis, but at the moment, the situation is impacting disproportionately on schools that are poorly funded. That is unfair. I was Police Minister when we cut the policing budget by 20% in real terms, but the impact was felt across all police forces. Although there was some difference in how forces were funded, we did not have a situation where some forces faced no cuts at all and others faced reductions and therefore felt they were being treated entirely unfairly.
It is important to recognise the particular situation of these authorities. That lends weight to the case for some kind of transitional help. Again, the Government recognised that, because in announcing the national funding formula they announced a £390 million uplift nationally in school funding, which was then put in the baseline. That has been applied year on year and is a large sum of money nationally. I recognise that, but if we look at the practical effect, the uplift amounted to less than £1 million for West Sussex’s budget, which meant the actual increase was something like £10 per pupil. The impact on schools’ budgets was therefore relatively low.
Because it was very broad, the distribution of that sum in the transitional uplift did not give sufficient help to the areas of the country that most needed it and was not sufficient to cushion them against the increased cost pressures they are facing. To bring West Sussex up to the average level of county councils—never mind the average national level—would require an uplift of £15 million a year, and it has had less than £1 million. That is why the schools are in this position. To bring funding up to the national average, as my hon. Friend the Member for Horsham said, would require a much greater uplift of £40 million a year.
Because of the cost pressures, the reduction in funding and its effect on schools in the county, and because the national funding formula will not be introduced for two years, there is a strong case for interim funding for the worst funded areas, despite the Government’s overall protection of the budget nationally. That would require taking decisions ahead of the introduction of the formula, which I appreciate would be difficult. It would require finding a basis on which to fund only those schools right at the bottom of the pile, rather than too broadly, which is what happened before. Again, that would be difficult, but it is necessary and right, or else schools in West Sussex will cut their budgets in a way that will see staff numbers fall. That is why I urge the Minister to look at this carefully and to recognise that a very fair and reasonable case is being made by schools in the county and that this deserves special attention.