(7 years, 10 months ago)
Grand CommitteeI support what the noble Lord, Lord Berkeley, has said. The scheme as envisaged is extravagant, and this is not a time when we can afford extravagance. There is a good case for having an independent assessment of the costs, particularly to consider such things as how long this railway can terminate at Old Oak Common, which would set aside a considerable sum of money. If a connection has to be made to Euston, how can that be done in the most economical way? I do not believe that that issue has been addressed. We are not talking about small sums of money; we are talking about billions of pounds.
One thing that I was told about the Bill was that people had made assumptions about the time it took to turn round a train from the north that was heading in the direction of London. I have run a lot of London stations. I can assure noble Lords that, with the number of trains that it is proposed to run from Manchester to Old Oak Common, it would be quite easy, given the six platforms there, to turn the trains round. What one has to factor in is the capacity at Old Oak Common. That means that there has to be a sufficient number of people to service the trains. Special attention also needs to be given to the access to and from the platforms.
I rather agree with the noble Lord, Lord Berkeley, about the Handsacre link, which seems to cost a lot of money. I certainly agree on the issue about speed. There is a complete misapprehension of the value of journey time savings when we talk about savings of two minutes or less, yet that structure holds up the whole of our transport evaluation, whether in road, rail or anything else—the biggest factor to be taken into consideration is the value of the small time savings, which are all added together and form a colossal sum. However, people making a journey do not take into consideration whether they are going to be two minutes quicker, because in lots of modes of transport unpredictability is a much bigger factor than the journey time saving.
I also want to probe—to push very hard—on the time savings. We should be very careful about speeds which go much above 125 miles per hour, possibly up to 150. It costs a lot once you push speeds towards the upper end of the limit. I am happy to join the noble Lord, Lord Berkeley, in his call for independent costings, but there is also a need for re-evaluation of the economic basis on which the line is to be built.
My Lords, we have dealt with only two amendments so far, and any member of the public sitting listening to the Committee will be asking themselves: “Why on earth are you going ahead with this project?”. All we have are problems, which seem to me almost insurmountable; we have no answers to them. When we ask about the trek from St Pancras to Euston, the answer is, apparently, offer £3 million to the local authority as a prize if it can come up with the answer. That does not sound to me like much of a solution.
I know that this is not Second Reading, but we must ask ourselves whether there is any sense in going ahead with this whole project. We have not yet dealt with the environmental problems, which will be huge and last for years. We have heard from the noble Lord, Lord Berkeley, whose amendment I support, that the whole scheme is not properly costed and nobody knows what will happen in the long run.
The Minister described it as a vital scheme. It is not. The money could be much better spent on all sorts of things: hospitals, schools, or Liverpool-to-Hull transport. If we pursue it, I think we will regret it for a long time. As this matter proceeds, I hope that your Lordships’ House will think it through very carefully and perhaps have second thoughts about proceeding with the whole scheme.