(5 years, 7 months ago)
Lords ChamberThe noble Lord is right to point out the benefits of having speed limits within contraflows. For safety reasons, there has been a speed reduction in the area while the contingency is in place: for the freight side the limit has been reduced to 30 miles per hour, and for the non-freight traffic travelling in the contraflow it is now 50 miles per hour. Highways England has redeployed 80 traffic officers to support Operation Brock, which will ensure that there are 30 on duty at any time. That action will ensure proper enforcement measures. We are also considering activating speed cameras and further signage.
My Lords, is not the trouble on the M20 often caused by strikes in France, so it is not in fact our fault at all?
Operation Brock is designed to be an improvement on Operation Stack, which we saw huge problems with in 2015. We actually used Operation Stack in mid-March; that was caused by high winds. My noble friend is right to point out that disruption can have a number of causes. That is why we have the contraflow in place: to ensure that we can deal with any disruption.
(6 years, 5 months ago)
Lords ChamberMy Lords, the noble and gallant Lord is quite right to point out that there may well be judicial reviews around this. Obviously, we are expecting that. The Airports Commission asks that the runway is delivered by 2030. As I said, Heathrow is working to 2026, and we have independent appraisals on that and will work closely with it. We will of course follow correct judicial processes on this, but we will work with Heathrow to get this delivered for 2026, as I say.
My Lords, what consideration is being given to using Manston Airport on the Isle of Thanet, particularly for freight, to relieve both Heathrow and Gatwick? I know that it is some way from London, but it is easily reached by road and rail, both of which run alongside the airport, which has the longest runway in Europe. Aircraft can go straight out over the North Sea and down the Dover Strait and into the English Channel.
My Lords, I know that there are some very interesting proposals around Manston Airport. One of the reasons why we chose Heathrow was because of its freight capacity and the expansion will deliver doubling of freight on that. Alongside that, we are already full at Heathrow, and expect to be full at other airports very soon. Alongside the laying of the final NPS, we announced the policy on making best use of existing capacity to ensure that other airports can do that.