Grand CommitteeMy Lords, I will start by explaining why we are considering this instrument under the urgent “made affirmative” procedure provided for in the European Union (Withdrawal) Act 2018.
This instrument is important for ensuring clarity and certainty for the rail industry and passengers. It fixes deficiencies in a number of pieces of rail-related legislation, including important changes to the rail safety legislative framework and corrections to minor issues in previous Brexit-related instruments raised by the JCSI.
The Government committed in previous debates on rail Brexit legislation in this House and to the JCSI that the rail safety amendments and the issues identified by the JCSI would be fixed in time for the UK’s exit from the EU. We gave very careful consideration to the appropriate procedure for this instrument. Providing certainty and clarity to industry and passengers is an absolute priority.
We concluded that in order to provide the right level of certainty and fulfil commitments made to this House and to industry, this instrument needed to be in place for exit day. Therefore, this instrument was signed and laid on 7 October using the urgent “made affirmative” procedure. Noble Lords will be aware that the Article 50 extension letter was not sent until 19 October, and the extension was agreed only on 28 October.
Turning to what this instrument does, its most significant provision is to introduce in Great Britain a two-year recognition period for Part A safety certificates issued in the EU before exit day by amending the Rail Safety (Amendment etc.) (EU Exit) Regulations 2019. It will also make corrections to EU implementing legislation that has come into effect since 12 April 2019, as well as some further minor corrections to earlier implementing legislation.
I will now provide some background information on the changes being made by this instrument, including Part A safety certificates. Part A safety certificates are valid for up to five years and are an essential piece of documentation for operators seeking to operate trains in Great Britain. They are issued by the ORR and set out the essential safety arrangements and systems a train operator has in place to run trains competently and safely.
This instrument will introduce a two-year recognition period for existing Part A safety certificates issued in the EU as part of establishing full regulatory control of our rail safety regime. This gives certainty that EU-issued Part A safety certificates will continue to be recognised for the purpose of operating trains on the mainline railway in Great Britain for two years after Brexit or until they expire, whichever is the sooner. A train operator will then need to apply to the ORR for a new Part A safety certificate and accompanying Part B safety certificate. Two years provide an appropriate amount of time in which industry can prepare and align itself with the GB domestic certification regime and are consistent with recognition periods introduced in other rail-related Brexit legislation. This SI also enables GB-appropriate control, which we will use to maintain our excellent safety record. Safety is always the number one priority on the railway.
Only one operator has been identified as providing services in Great Britain using a Part A safety certificate issued in another EU member state. The operator is RTS Rail Transport Service GmbH. Officials from my department and the ORR have actively engaged with the operator concerned to ensure that it is prepared for Brexit, and its application for a new Part A certificate is well advanced.
Turning to the amendments correcting issues in previous Brexit-related instrument, I reassure noble Lords that the instrument we are considering today has been through pre-legislative scrutiny by the JCSI which returned it without comment. It was also considered by the JCSI in its meeting of 16 October and was not identified as an instrument to be brought to the attention of the House. The JCSI identified minor drafting issues in two previous rail Brexit instruments. I am sure noble Lords will remember that I detailed at least two of those drafting issues in a previous debate, but just in case I will do so again briefly.
In specific terms, the JCSI identified three missing words in the Railways (Safety Management) (Amendment) (EU Exit) Regulations (Northern Ireland) 2019. They were a definition relating to the Northern Ireland Department for Infrastructure’s monitoring of safety targets, namely the term “risk to whole”. The committee identified that the term,
“risk to society as a whole”,
appears in paragraph 12(3)(f) of Schedule 7, and that this term should have been defined in paragraph 2 in place of “risk to whole”. The committee also considered that the words,
“risk to society as a whole”,
should have been set out in full rather than the label “whole society” in the table at the end of the schedule.
In addition, the JCSI identified minor drafting errors in the Railways (Access, Management and Licensing of Railway Undertakings) (Amendments etc.) (EU Exit) Regulations 2019. Specifically, they were a duplication of a sub-paragraph and an incorrect cross-reference to other legislation. Those errors are corrected in this instrument, and the Government would like to thank the JCSI for pointing them out.
My department has also identified small analogous errors in two other Brexit instruments, the Rail Safety (Amendment etc.) (EU Exit) Regulations 2019 and the Railways (Interoperability) (Amendment) (EU Exit) Regulations 2019. These errors are also corrected in this instrument.
This instrument will also make the usual Brexit-related corrections to EU implementing legislation that has come fully into effect since 12 April 2019. These include corrections such as removing references to “member states” and replacing references to European legislation with references to domestic legislation wherever possible. The instrument also makes some further minor corrections to earlier implementing legislation.
It is important to emphasise that officials have worked closely with the industry throughout the preparation of this instrument and it will welcome the clarity and certainty that it will provide. The provisions contained in this instrument will enable the rail legislative framework to continue to operate effectively after exit day. This instrument provides certainty to the railway industry and passengers and will ensure that the rail legislative framework continues to function effectively after the UK leaves the EU. I commend these regulations to the Committee. I beg to move.
My Lords, I thank the Minister and her officials for talking us through these regulations at a meeting yesterday. I am very grateful for her time. Despite her enthusiasm, I had to supress a weary sense of déjà vu about this, but then I thought of an upside. When the history of this Parliament is written, this SI will go down as one of the significant pieces of legislation passed during this Session which, after all, has lasted only a couple of weeks, so it will have its place in history and therefore I set my mind to looking at it with rather more attention and diligence. But my whole spirit protests at the amount of time that we, and particularly officials, have spent preparing for a no-deal Brexit—an issue which is so damaging that it should never have been a credible option.
This SI fixes deficiencies in previous drafting, as the Minister has noted. I believe that there are four of them; that is quite a lot for such a short piece of legislation. My concern is that officials have been under such pressure to churn out such no-deal legislation, if I can call it that, that it has been very difficult for them to maintain the usual high standards. I had a quiet laugh at the opening line of paragraph 2 of the Explanatory Memorandum, which tells us:
“The Government is committed to leaving the European Union on 31 October”.
I will come back to this later on.
The core purpose of this SI is to put in place a system of recognition of Part A safety certificates for rail operators. It introduces a two-year recognition period, which is flexible according to the renewal date. As the Minister has pointed out to us, this affects only one company but it is symptomatic of the ridiculous position that we are in. Part A certificates are currently EU-portable; the company concerned therefore only has to get them once, and they apply in all EU countries where that company operates. It is proposed that, in future, the ORR will issue Part A certificates. As a result, as the Secondary Legislation Scrutiny Committee’s report observes:
“ORR issued Part A safety certificates will be substantially the same in terms of content compared to EU issued Part A safety certificates, including the requirements necessary to obtain one. However, after the UK leaves the EU ORR issued Part A certificates will not have EU identification numbers, EU symbols or references to the EU. ORR issued Part A safety certificates will not be valid in the EU”.
This is about creating something which is identical in intent but has a different badge. It creates more complexity and bureaucracy; it is very far from the rosy image we were sold in 2016. The effect is of course that the company concerned, and any other company which might come along and need this certificate, will have to get two certificates rather than only one. What is more, since it is a criminal offence to operate a railway without a Part A certificate, the criminal offence has to be adjusted too. What will happen to the mountain of paperwork and complexity that we have created when, or if, we decide not to leave the EU after all? Are we going to have to unwind it painfully, SI by SI, or could we have just one mega-piece of legislation saying: “Forget what we have done for the last year”?