Contracts for Difference (Electricity Supplier Obligations) (Amendment) (Coronavirus) Regulations 2020

(Limited Text - Ministerial Extracts only)

Read Full debate
Thursday 2nd July 2020

(3 years, 10 months ago)

Lords Chamber
Read Hansard Text
Moved by
Lord Callanan Portrait Lord Callanan
- Hansard - - - Excerpts

That the draft Regulations laid before the House on 4 June be approved.

Relevant document: 18th Report from the Secondary Legislation Scrutiny Committee

Lord Callanan Portrait The Parliamentary Under-Secretary of State, Department for Business, Energy and Industrial Strategy (Lord Callanan) (Con)
- Hansard - - - Excerpts

My Lords, the aim of this draft instrument is to limit the negative short-term impact on electricity suppliers of an unexpected increase in the costs of the contracts for difference—CfD—scheme as a result of measures introduced to reduce the spread of the novel coronavirus. Before outlining the provisions, I will briefly provide some context for the benefit of your Lordships.

The CfD scheme is the Government’s main mechanism for supporting new renewable electricity generation projects in Great Britain. The CfD is a 15-year contract between a renewable generator and the Low Carbon Contracts Company—LCCC—a government-owned company that manages CfDs and is at arm’s length from the Government.

Contracts are awarded in a series of competitive auctions that determine the strike price in pounds per megawatt hour that the generator will be paid for the electricity produced. Generators receive revenue from selling their electricity into the market as usual. However, when the market reference price of electricity is below the strike price, generators receive a top-up payment for the additional amount. Similarly, at times when the reference price is above the strike price, the generator pays the LCCC.

The LCCC is the designated CfD counterparty under Section 7 of the Energy Act 2013, and as such it has a power to collect payments from licensed electricity suppliers through the CfD supplier obligation to enable it to make CfD top-up payments to generators. This obligation comprises a daily interim rate levy paid on each megawatt hour of electricity supplied, plus a total reserve amount paid in the form of a lump sum at the start of each quarter to cover uncertainty.

Both rates are set by the LCCC three months ahead of each quarter, based on the LCCC’s forecasts of CfD payments and electricity demand. At the end of each quarter, the LCCC carries out a reconciliation of the amount owed by suppliers, based on the actual payments made to generators and amounts received from suppliers. The LCCC advised BEIS that, because of measures introduced to reduce the spread of coronavirus, it was anticipating a shortfall in funds required to pay CfD generators in the second quarter of this year, from April to June.

The LCCC had observed a sharp fall in electricity demand across the quarter, of around 13%, as a result of the lockdown. This would have meant a significant reduction in the amount collected from suppliers under the interim rate levy. There was also a significant fall in the wholesale price of electricity, which would lead to increased payments to CfD generators of £18.6 million higher than forecast. The combined effect of these unanticipated changes is a forecast shortfall of £121 million between the amount owed to CfD generators and the amount collected from suppliers under the interim rate levy.

To address the shortfall, the LCCC was considering an increase of between 22% and 35% in the interim levy rate part-way through the second quarter of this year. This would have been the first time such action was needed. Electricity suppliers would have faced an unexpected increase in their obligations at short notice and at a time when they were facing significant other pressures. Therefore, in line with efforts to support the economy in the light of the Covid-19 national emergency, the Government agreed to provide a loan of up to £100 million to the LCCC so that it could continue to pay CfD generators during the current quarter without increasing the financial burden on suppliers. The loan is governed by a separate agreement between BEIS and the LCCC and is not covered in this instrument.

Following consultation, the Government also announced that they intended to make changes to regulations to enable the LCCC to defer collection of the additional obligations covered by the loan to the second quarter of 2021. If regulations were not changed, suppliers would face a higher lump-sum payment to the LCCC this month, following the quarterly reconciliation exercise. This draft instrument makes four technical changes to the existing Contracts for Difference (Electricity Supplier Obligations) Regulations 2014 to implement the deferral.

First, it reduces each electricity supplier’s obligation in a quarterly obligation period by the amount of the financial assistance provided by the Government to the LCCC for that purpose, multiplied by each supplier’s market share in that quarter. Secondly, it increases each electricity supplier’s obligation four quarters later by the amount of financial assistance previously provided to the LCCC, multiplied by the supplier’s market share in that later quarter. Thirdly, it enables the LCCC to take into account anticipated receipt or repayment of financial assistance provided by the Government when setting the obligation for a quarter. Finally, it enables the LCCC to repay any financial assistance provided by the Government using moneys collected from electricity suppliers after the reconciliation process following the relevant quarterly obligation period. This deferral will give suppliers more time to prepare for the increase in payments. It provides greater confidence over the level of additional costs that they will face in the second quarter of 2021, enabling suppliers to price future tariffs with minimum cost risk.

I stress that the Government are committed to upholding the self-financing nature of levies in the energy system. The loan to the LCCC and the arrangements for deferring repayment are therefore envisaged to be a one-off response to the current exceptional circumstances arising from Covid-19. However, the mechanism in this instrument is not time-limited and could be used again in the future, if required. This would enable the Government to intervene quickly to ensure that CfD generators can continue to be paid, and burdens on suppliers could be deferred, if a similar exceptional event arose in the future. These legislative changes need to be made ahead of the LCCC’s quarterly reconciliation process that determines suppliers’ obligations for quarter 2 of this year. This is expected to take place on 9 July. Therefore, subject to the will of Parliament, this instrument will enter into force the day after it is made, and I commend these regulations to the House.

--- Later in debate ---
Lord Callanan Portrait Lord Callanan
- Hansard - - - Excerpts

I thank noble Lords for their valuable contributions to this debate. As so often, they have strayed far and wide on the general subject of renewable energy and government support, as well as addressing the individual points made in this particular instrument. Nevertheless, in an effort to be as helpful to the House as possible, I will address most, if not all, of the points that noble Lords have raised.

Coronavirus is the biggest challenge that the UK has faced in decades. During this turbulent time, the Prime Minister has said that we will take every step that we can to ensure businesses are protected and the economy remains strong. The Government have introduced an exceptional package of financial support for households and businesses to help them through these difficult times. This includes £330 billion-worth of loans and guarantees, tax deferrals, and a package of temporary welfare measures worth over £6.5 billion, including increases to universal credit, working tax credits and local housing allowances.

It was therefore important that the Government took action when the LCCC advised BEIS that, as a result of measures introduced to reduce the spread of coronavirus, suppliers would face a significant unexpected increase in their obligations for the second quarter of 2020. By providing the loan to the LCCC to cover the majority of these unanticipated and exceptional additional costs, and by deferring repayments by 12 months, the Government are ensuring that the impact on suppliers is minimised. It also provides them with greater confidence in the additional costs that they will face in quarter 2 of 2021, enabling them to price future tariffs with minimal cost risk. In addition to protecting suppliers at this time, it is essential that we maintain investor and generator confidence in the CfD scheme by ensuring that payments can be made to renewable generators. This will allow us to continue to deliver on our commitment to provide clean, affordable electricity for consumers.

I can tell the noble Baroness, Lady Jones, that the UK is a world leader in clean growth, with more than £94 billion having been invested in clean energy in the UK since 2010. In the first quarter of this year, the renewables share of total electricity generation was 47%, the highest quarterly value on record and exceeding the share of generation from gas. I am sure that she, as a Green, will welcome these figures. The success of the CfD scheme will be pivotal as we emerge from Covid-19 into a phase of renewed green recovery and economic growth on the path to net zero.

In response to the noble Lord, Lord Oates, I can say that, so far, the CfD scheme has awarded contracts for 16 gigawatts of new renewable energy capacity, including 13 gigawatts from offshore wind. It is also driving down the costs of renewable technologies: for example, offshore wind clearing prices have reduced by 65% since the first CfD allocation round, with projects now being delivered for as little as £39.65 per megawatt-hour of electricity generated. The Government have committed to providing up to £557 million for additional CfDs, giving the industry the certainty that it needs to invest in bringing forward new projects. On 2 March this year, the Government announced their intention to allow pot 1 technologies, including onshore wind and solar, to compete in the next CfD allocation round of 2021. This could provide even more jobs in the solar and onshore wind industries, in addition to the 12,100 already supported, and power millions more homes with clean energy by the end of the decade.

I will move on to some of the specific points raised in the debate. The noble Baroness, Lady Bowles, asked whether Ofgem would take the increased obligation into account when settling the price cap in August. Ofgem has the powers, timing and information necessary to ensure that the impacts of the changes to the supplier obligation provided for in this SI can be reflected in the price cap.

The noble Lords, Lord Grantchester and Lord Oates, and the noble Baronesses, Lady Bowles and Lady Jones, raised the impact on bills. The increase in suppliers’ obligations will be very small; we estimate that it will correspond to approximately 0.1% of a typical domestic annual bill. The precise amount will vary, depending on how much of the loan is used by the LCCC and on the evolution of bills over time.

The noble Baroness, Lady Jones, also renewed our long-standing debate about where we should fund the various schemes from: should it be from general taxation or from levies on bills? She knows my position on this, and I am sure we will continue to have that debate going forward.

The noble Baroness, Lady Bowles, and my noble friend Lord Naseby asked about the responses to the consultation. These have not been published, but the organisations that responded are listed in the Government’s response, and individual responses can be viewed on request. I can tell the House that the measures were broadly welcomed by both electricity suppliers and trade associations.

The noble Lords, Lord Foulkes, Lord German, Lord Kirkhope and Lord Grantchester, asked what similar exceptional circumstances would require these regulations to be used again. Obviously, by the very nature of exceptional circumstances, it is difficult for me to be precise—nobody could have predicted coronavirus —but this intervention can be used again in future if the effects of Covid-19 last longer than anticipated, or in the event of a similar national emergency, whatever that may be, and this will be decided by the Secretary of State on a case-by-case basis. I hesitate to say it, but perhaps it is a case of the noble Lords having to trust the Government on this one. But I can make the general point that we are committed to upholding the self-financing nature of levies in the energy system, and we will not intervene to alleviate normal fluctuations and variances in the LCCC’s forecasts.

My noble friend Lady McIntosh asked how the loan is being financed. It is being financed in a loan agreement between the LCCC and the Secretary of State, and it has been drawn in accordance with government accounting rules and is non-budget. However, as I said at the start, that is not actually the subject of this instrument.

The noble Lords, Lord Kirkhope and Lord Grantchester, asked whether we could be confident that it would be repaid in full by quarter 2 of 2021. We are confident that it will be repaid in full. If suppliers do not pay their obligations, the LCCC has enforcement powers to ensure that they pay. If suppliers go out of business and do not have the collateral available to pay the obligation, the LCCC can mutualise losses across remaining suppliers to repay the loan in full to my department.

I want to just correct slightly the figures quoted by the noble Lord, Lord Grantchester. I think we said that the shortfall in the LCCC was up to £121 million, but the loan provided by BEIS to alleviate that is up to £100 million; the LCCC will be financing the rest of the amount itself.

My noble friend Lord Naseby asked me about Northern Ireland, which is not currently covered by the CfD scheme. That was the choice it made; it is open for Northern Ireland to join the scheme in future if it wishes.

The noble Lord, Lord German, talked about Ofgem’s targeted charging review. Network charging is for Ofgem itself to determine as an independent regulator.

The noble Baroness, Lady Sheehan, asked about the Committee on Climate Change report. We will formally respond to that later this year, but the PM has set up a Cabinet committee focusing on climate change.

My noble friend Lord Holmes talked about Hinkley Point C, which is totally unrelated to this debate. Nevertheless, we remain committed to Hinkley Point C as the first new nuclear power station in a generation. We believe that we negotiated a competitive deal which ensures that we will pay for any construction overruns until the station starts generating.

I am running quickly out of time. The noble Lord, Lord Oates, talked about the potential impact on consumers. We said that it would probably be 0.1%, but of course it will depend on aggregate demand.

The noble Lord, Lord Grantchester, talked about the size of the loan; I have dealt with that. I have also dealt with the issue about exceptional circumstances.

In conclusion, the technical amendments to the supplier obligation mechanism in this SI, combined with the provision by government of a one-off loan, are intended to ease the burden on licensed electricity suppliers at a time of great financial stress due to Covid-19. I commend these draft regulations to the House and apologise if I have not dealt with any individual questions from noble Lords.

Motion agreed.