To ask His Majesty's Government what assessment they have made of the budget for the A2/M2 Connected Corridor project for 2018–2020 including the cost of (1) consultants, and (2) feasibility studies, both within the budget and including those covered by (i) other budgets, or (ii) EU funding.
The final overall cost, including all feasibility studies, consultancy and contractor costs, was £9.5 million of which £3.5 million was received from the European Union Connecting Europe Facility fund.