East Coast Railway Line: Level Crossings

(asked on 15th July 2015) - View Source

Question to the Department for Transport:

To ask the Secretary of State for Transport, pursuant to the Answer of 14 July 2015 to Question 6464, how many of the 73 East Coast Main Line level crossings Network Rail plans to close during Control Period 5.


Answered by
 Portrait
Claire Perry
This question was answered on 20th July 2015

Network Rail will consider the case for closure of level crossings on the East Coast Main Line during Control Period 5 alongside other schemes to reduce risk at level crossings on the network.