Schools: Buildings

(asked on 4th September 2023) - View Source

Question to the Department for Education:

To ask the Secretary of State for Education, whether her Department plans to provide additional funding to schools affected by the use of reinforced autoclaved aerated concrete (RAAC) for the cost of (a) hiring and (b) fitting temporary accommodation that is not on a school site.


Answered by
David Johnston Portrait
David Johnston
Parliamentary Under-Secretary (Department for Education)
This question was answered on 18th September 2023

Nothing is more important than the safety of children and staff. It has always been the case that where we are made aware of a building that may pose an immediate risk, the Department takes immediate action. This Government has taken more proactive action on RAAC than any other in the UK.

The Department will fund emergency mitigation work needed to make buildings safe, including installing alternative classroom space where necessary. Where schools and colleges need additional help with revenue costs, like transport to locations or temporarily renting a local hall or office, the Department will provide that support for all reasonable requests. Longer-term refurbishment projects, or rebuilding projects will also be funded where these are needed, to rectify the RAAC issue in the long term.

It is the responsibility of those who run schools – academy trusts, Local Authorities, and voluntary aided school bodies – who work with their schools on a day to day basis, to manage the maintenance of their schools. These responsible bodies may deploy temporary buildings for a wide range of reasons, not all of which will relate to building or refurbishment works. In addition, most building and refurbishment works within education settings do not involve RAAC and will not require the involvement of the Department. The Department does not therefore hold information on the number of schools using temporary classrooms.

Where schools need to vacate buildings due to RAAC, they use a range of different types of accommodation including accommodation on and off site. On site accommodation can include semi rigid structures and temporary classrooms. Where temporary units and structures are required as a result of buildings having been vacated due to the confirmed presence of RAAC, the Department has increased the supply of these, working with three contractors to accelerate the installation of temporary units in particular. The Department has not, therefore, produced central estimates of the number of temporary classrooms required, however, we can confirm that we have secured significant capacity to meet current needs, and can increase this if necessary. Our focus is on working closely with individual settings to make sure they have workable plans for their individual circumstances and context. Based on the experience where RAAC assessed as critical was found, the Department expects the vast majority will be able to continue to provide face to face teaching without any disruption.

Reticulating Splines