Educational Institutions: Concrete

(asked on 13th March 2024) - View Source

Question to the Department for Education:

To ask the Secretary of State for Education, what her planned timetable is for completing RAAC remedial works in all (a) schools and (b) colleges.


Answered by
Damian Hinds Portrait
Damian Hinds
Minister of State (Education)
This question was answered on 21st March 2024

Well-maintained, safe school buildings are a priority for the department to support a high-quality education for all children. The department has allocated over £15 billion since 2015 for keeping schools safe and operational, including £1.8 billion in the 2023/24 financial year. In addition, the School Rebuilding Programme is transforming poor condition buildings at over 500 schools.

The government is funding the removal of RAAC present in schools and colleges either through grants, or through the school rebuilding programme. A list of education settings with confirmed RAAC and the funding route to remove RAAC was published on 8 February, available at: https://www.gov.uk/government/publications/reinforced-autoclaved-aerated-concrete-raac-management-information.

The longer-term requirements of each school or college will vary depending on the extent of the issue and nature and design of the buildings. Permanently removing RAAC may involve refurbishment of existing buildings or rebuilding affected buildings. For schools joining the School Rebuilding Programme, schools will be prioritised for delivery according to the condition need of their buildings, readiness to proceed, and efficiency of delivery. For schools and colleges receiving grants, we are working with the responsible bodies to support them through the grants process as they undertake the buildings works to remove RAAC permanently.

In some cases, this may involve undertaking technical assessments to inform the design of building works and in other cases the removal or RAAC is already underway and will be completed in the coming months. The department is working with responsible bodies to take forward this work as quickly as possible.