The table below shows the number of new affordable residential pitches (a) started and (b) completed on traveller sites in each local authority area under the 2015-18 Affordable Homes Programme. All other local authority areas not listed in this table show a nil-return.

Local Authority

a) Started pitches

b) Completed pitches

Central Bedfordshire

2

2

Darlington

22

22

Harlow

12

12

Solihull

7

0

Total

43

36*