Portsmouth International Port

(asked on 15th October 2020) - View Source

Question to the Department for Transport:

To ask the Secretary of State for Transport, what support the Government is providing to the Hampshire and Isle of Wight Local Resilience Forum to help ensure that Operation Transmission will be in place before the end of the transition period on 31 December 2020.


Answered by
Rachel Maclean Portrait
Rachel Maclean
This question was answered on 23rd October 2020

DfT officials are working closely with the Hampshire and Isle of Wight Local Resilience Forum (LRF) to ensure that the LRF has the required analysis and information to enable it to stand up an effective local traffic management plan (Operation Transmission), in case of traffic disruption post the EU Transition period.

Reticulating Splines