Approve the Whitehaven Coal Mine in Cumbria

World coal production is 8 billion tonnes. China alone produces 3.5 billion tonnes. The new colliery will produce around 4m tonnes of coal for steel making and should replace imported coal. It would close in 2049 and will provide the steel needed by the UK to comply with UK environmental targets.

This petition closed on 29 Sep 2021 with 1,629 signatures


Reticulating Splines

You may be interested in these active petitions

1. Reform e-petitions - referendum at 500k, no word limits, immediate publication - 3,311 signatures
2. Revoke support for the Israeli Government and recognise the State of Palestine - 9,377 signatures
3. For the United Kingdom to recognise the state of Palestine immediately - 12,291 signatures
4. Let airlines allow pets in the airplaneā€™s cabin to and from the UK - 11,466 signatures
5. Take action to support the Democratic Republic of the Congo - 6,676 signatures

The Whitehaven mine will be built on a brown field site in an existing coal mining area. Approval for the mine was won after after agreement to comply with many environmental stipulations. The coal would not be burned but used in steel-making. It should provide over 2,000 local jobs and support UK exports and the economy. This steel will be needed to support environmental projects such as wind turbines and public transport networks such as rail links. This is a green project.


Petition Signatures over time

Constituency Data

Reticulating Splines